Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
EFFEKTIVISERING AV DELMOMENT I PROCESSKARTLÄGGNING
Örebro University, School of Science and Technology.
Örebro University, School of Science and Technology.
2013 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Efficiency of subsection in the process mapping (English)
Abstract [sv]

Den här C-uppsatsen har gått ut på att göra en processkartläggning på återuppbyggnaden av Vivallaskolans bollhall som har brunnit ner under slutet av oktober 2010. Utifrån processkartläggningen har det gjorts analyser och observationer på aktivitetsflödet. Där framgår det vad som har gått bra och mindre bra. Till det som har gått mindre bra har förslag till lösningar tagits fram. I dessa lösningar ingår metoderna: PDCA (s.21), BIM (s.21) och Ishikawadiagram (s.21), som tydligt visar förbättringsåtgärder.

Processkartläggningen och lösningsförslagen har tagits fram utifrån observationer i form av besök på arbetsplatsen samt läsning av litteratur och elektroniska källor. Vid besök och samtal med platschef och snickare har det även uppmärksammats att Lean, vilket är en metod för effektivisering av olika aktivitetsflöden, redan delvis används inom produktionsskedet i detta byggprojekt. Detta har gjorts för att effektivisera och utveckla produktionsskedet kvalitativt.

I takt med att processkartläggningen har blivit kartlagd och analyserad kan de inblandade i projektet tydligt följa förslag till förbättringar. Detta för att förhindra att eventuella problem som har tagits upp i den här C-uppsatsen uppstår. Dessa förslag kan de använda sig av till nästkommande projekt redan i projekteringsskedet.

Abstract [en]

This thesis involves a process mapping to the rebuilding of the gymnasium of Vivallaskolan that burned down at the end of October 2010. Analyses and observations in the activity flow are based on the process mapping. There it shows what subsection that has gone well and less well. Suggested solutions have been made to the problems that gone less well. These solutions show clearly how they can be improved and are based on the following methods: the PDCA-cycle (page 21), BIM (page 21) and Ishikawa diagrams (page 21).

This process mapping and suggested solutions are based on observations at the construction site together with reading literature and electronic sources. During visits and conversations with the construction manager and carpenters it have been recognized that Lean, which is a method for efficiency of different activity flows, are already partially used in the production of this construction project. These suggested solutions have been made to improve and develop the production phase qualitatively.

During the survey and analysis of the process mapping, those who are involved in this construction project can clearly see and follow these suggested solutions. These are made to avoid upcoming problems which have been described in this thesis. These solutions can be used to upcoming construction projects already at the designing and calculation phase.

Place, publisher, year, edition, pages
2013.
Keyword [en]
Construction, process mapping, Lean, production, activity flow
Keyword [sv]
Bygg, processkartläggning, Lean, produktion, aktivitetsflöde
National Category
Construction Management
Identifiers
URN: urn:nbn:se:oru:diva-29865OAI: oai:DiVA.org:oru-29865DiVA: diva2:634183
Examiners
Available from: 2013-07-16 Created: 2013-06-28 Last updated: 2017-10-17Bibliographically approved

Open Access in DiVA

fulltext(1005 kB)362 downloads
File information
File name FULLTEXT01.pdfFile size 1005 kBChecksum SHA-512
f0d8b9586c5cc8fb9539c0726810170efa298a495e06bf137a2d80878c98ce53003fc4673c3df6ceb095a526434d17ae765ffb42205d027337cdad2289b43f01
Type fulltextMimetype application/pdf

By organisation
School of Science and Technology
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 362 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 621 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf