Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Reducering av ledtid genom en värdeflödesanalys En fallstudie på Lammhults Möbel AB
Linnaeus University, Faculty of Technology, Department of Mechanical Engineering.
Linnaeus University, Faculty of Technology, Department of Mechanical Engineering.
Linnaeus University, Faculty of Technology, Department of Mechanical Engineering.
2013 (Swedish)Independent thesis Basic level (degree of Bachelor), 15 credits / 22,5 HE creditsStudent thesisAlternative title
Reduction of lead time by a value stream analysis a case study at Lammhults Möbel AB (English)
Abstract [en]

The purpose of this study is to increase the understanding of activities, flows and waste in a company's production process. By performing a value stream analysis, non-value adding activities are identified in a production process and then the suggested improvements that can reduce lead times will be stated. The value-stream mapping identifies the flow of information and the flow of material in a production process and this provides the basis for the identification of non-value adding activities.

We conducted the study at Lammhults Möbel AB in Lammhult Sweden, where the production flow of Spira-21 has been investigated. This to identify any non-value adding activities that affect the flow negative and consumes time and money in a non-value adding way.

A reasonable approach for the project was taken by studying the methodologies and theories. We conducted interviews and site surveys at Lammhults Möbel AB where the flow of information and material in the production process were investigated. Then a current state map of the production flow is constructed and we were able to identify non-value adding activities. By studying our value-stream map and compare this with the theoretical background suggestions of improvement for reducing non-value adding activities will be done. These suggestions can answer our main question;

How can non-value adding activities in the flow of material and information be reduced in order to reduce the lead-time of a company's production process

The proposed improvements that are developed includes, reduce storage. Implementing Lean tools, such as 5S, Kaizen and Kanban, and streamline production management and set demand for delivery of the company's suppliers to get a JIT system.

Through implementation of proposals, unnecessary inventory, transportation and movements will decrees. There will be more effective management and production becomes more systematic. To consider this result, we believe the lead-time will be reduced and our purpose is achieved.

Place, publisher, year, edition, pages
2013. , 89 p.
Keyword [sv]
Materialflöde, informationsflöde, icke värdeskapande aktiviteter, Ledtid, lean
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:lnu:diva-26228OAI: oai:DiVA.org:lnu-26228DiVA: diva2:626780
External cooperation
Lammhults Möbel AB
Subject / course
Mechanical Engineering
Educational program
Industrial Engineering Programme with specialization in Management and Production, 180 credits
Uppsok
Technology
Supervisors
Examiners
Available from: 2013-06-12 Created: 2013-06-10 Last updated: 2013-06-12Bibliographically approved

Open Access in DiVA

Examensarbete2013(1249 kB)536 downloads
File information
File name FULLTEXT01.pdfFile size 1249 kBChecksum SHA-512
26c7f886ad31c58f6c85c423d074749653dfef9e7247eeb1e27923dcbbfdc6401efc12d6b15d109d5d0d911abd9f257efbb1a7bc2ccd134de593940c7a1b7094
Type fulltextMimetype application/pdf

By organisation
Department of Mechanical Engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 536 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 383 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf