Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Analys och utformningsförslag av produktionslina vid ökad ordervolym av katalysatorer: Swenox AB
Karlstad University, Faculty of Technology and Science, Department of Mechanical and Materials Engineering.
2013 (Swedish)Independent thesis Basic level (university diploma), 15 credits / 22,5 HE creditsStudent thesisAlternative title
Analysis and layout suggestion of production line at higher order volume of catalysts (English)
Abstract [sv]

Examensarbetet har utförts av Ida Montan, maskiningenjörsprogrammet på Karlstad Universitet. Arbetet har skett i samarbete med Swenox AB. Ett företag vars produktion är belägen i Nyköping. Företaget tillverkar avgassystem till tunga och medeltunga lastbilar och till bussindustrin. Examensarbetet är begränsat till den enskilda linan, sleevingsinan, i produktionen som gör katalysatorer till avgassystemen. Den problemställning som företaget har är att produktionen på avgassystem kommer öka avsevärt fram till 2014. En värdeslödesanalys har därför gjorts på sleevinglinan för att få en bra översikt och förståelse om hur dagsläget ser ut. Detta för att sedan kunna utforma en ny värdeflödesanalyskarta över hur produktionsstyrningen skulle kunna se ut 2014 där hänsyn har tagits till den ökade produktionsvolymen. För att klara den ökade produktionsvolymen, en ökning på 85% på sleevinglinan, så har det utformats en ny layout av maskinparken där fler maskiner har tillkommit och några har flyttats för att få ett så bra flöde som möjligt. Valet av hur många maskiner som borde köpas in har skett med tanke på vilken skiftform det kommer vara och på hur mycket tillgänglig tid som finns per år. Även en uppskattning på hur många operatörer per skift som behövs har tagits fram. Både utformningen på värdeflödesanalysen över 2014 och den nya layouten har skett med tanke på lean. Detta för att få ett så resurssnålt och effektivt produktionssystem som möjligt. Det är fullt möjligt att inom tidsramarna fram till 2014 utforma produktionen efter de förslag som examensarbetet har genererat. 

Abstract [en]

The thesis has been performed by Ida Montan, for the mechanical engineering program at Karlstad University. The thesis has been done in cooperation with Swenox AB. It’s a company whose production is located in Nyköping. The company manufactures exhaust systems for heavy and medium heavy trucks and for the bus industry. The thesis is limited to the individual line called the sleevingline which makes catalysts for the exhaust systems. The problem the company has is that the production volume will increase significantly to 2014. A value stream map, VSM, is therefore made on the sleevingline to get an overview over the production and to get a better understanding on how the line works. This is made so that a new value stream map could be made over the 2014 production with the consideration on the higher volume. To cope with the increased production volume, an increase for 85% at the sleevingline, a new layout has been formed over the machinery. Some machines have been added and some has been moved to make the flow of the products as good as possible. The decision of how many machines that should be added vas made from the shift form, how much time that’s available a year. An estimation of how many operators that should be needed a shift was also made. Both the value stream map for 2014 and the new layout over the machinery have been made with thinking of lean production. The lean thinking is used to make the production system as efficient and good as possible. It is doable to within the timeframe up to 2014 to design the production after the results of this thesis. 

Place, publisher, year, edition, pages
2013. , 68 p.
National Category
Production Engineering, Human Work Science and Ergonomics
Identifiers
URN: urn:nbn:se:kau:diva-27355Local ID: MT:2OAI: oai:DiVA.org:kau-27355DiVA: diva2:622678
Subject / course
Mechanical Engineering, Bachelor of Science
Supervisors
Examiners
Available from: 2013-06-13 Created: 2013-05-22 Last updated: 2013-06-13Bibliographically approved

Open Access in DiVA

fulltext(2580 kB)202 downloads
File information
File name FULLTEXT01.pdfFile size 2580 kBChecksum SHA-512
31e0a1557620affe74b8e8661f55f52ef61c3d07c7436bbee955e64177589f2c2b470d5390d0774011b821059b34fe8e0b7eb6aa0679df2d25670a6469926b44
Type fulltextMimetype application/pdf

By organisation
Department of Mechanical and Materials Engineering
Production Engineering, Human Work Science and Ergonomics

Search outside of DiVA

GoogleGoogle Scholar
Total: 202 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 95 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf