Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Logistics and Skanska Xchange: Supply chain improvements in the construction industry
KTH, School of Industrial Engineering and Management (ITM), Production Engineering.
KTH, School of Industrial Engineering and Management (ITM), Production Engineering.
2011 (English)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

This master thesis has aimed to answer the question whether logistic solutions for made to order materials should be included in the Skanska Xchange concept. Skanska Xchange is a project that gathers knowledge, methods and expertise from the Nordic countries with the purpose of providing standardized construction methods. We believe the answer to the thesis’ question is yes. However, Skanska Xchange should initially not invest in developing any new solutions. There are currently several good logistics initiatives within the Skanska organization, but they are never deployed on a company wide basis. Instead, the logistics solution largely depends on who is involved in any given project. It is our belief that Skanska Xchange could help turning said logistics initiatives into standard procedures within the Xchange project. During our work with this thesis, problems have been identified and analyzed mainly from a lean construction perspective, focusing on eliminating or minimizing what we have classified as waste. Recommended solutions to be adopted by the Xchange concept include the use of terminals and logistics centers, carry-in services, installation packages and kitting. The solutions have also been discussed from two perspectives: solutions to be used during framework assemble and solutions to be used after framework assembly.

Place, publisher, year, edition, pages
2011. , 78 p.
Series
Master's Project in Production Engineering, 455
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:kth:diva-121695OAI: oai:DiVA.org:kth-121695DiVA: diva2:619454
Educational program
Master of Science - Industrial Engineering and Management
Uppsok
Technology
Examiners
Available from: 2013-05-07 Created: 2013-05-03 Last updated: 2013-05-07Bibliographically approved

Open Access in DiVA

fulltext(1495 kB)2061 downloads
File information
File name FULLTEXT01.pdfFile size 1495 kBChecksum SHA-512
e050d22a35d0a5b4e4983bf38a0a6110cf950386dc446d8c889930e5428b854d32a61467e93537c9bcbc33123faae9d81926b66d3a94fb807b77b84b20115893
Type fulltextMimetype application/pdf

By organisation
Production Engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 2061 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 511 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf