Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Stopptidsanalys i hyvelanläggningen vid VIDA Vislanda
Linnaeus University, Faculty of Technology, Department of Forestry and Wood Technology.
Linnaeus University, Faculty of Technology, Department of Forestry and Wood Technology.
2015 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Stop time analysis in the planing facility at VIDA Vislanda (English)
Abstract [sv]

VIDA Vislanda har ett behov av att veta hur effektiv produktionen är på deras nya hyvleri. Därför är arbetets syfte att undersöka stopptidslängder samt bakomliggande orsaker till stoppen på företaget. Det ingår även i arbetet att lämna förslag på åtgärder som kan leda till förbättringar i verksamhetsgrad samt reduktion av stopptid.

VIDA Vislanda vill veta vilken verkningsgrad, verklig löpmeter ut och verkligt stycketal ut för varje enskild dimension och längd. Resultatet presenteras efter detta önskemål men den totala verkningsgraden för hela mätperioden har också beräknats, till 52 %. Om VIDA åtgärdar de största återkommande stopporsakrna enligt våra förbättringsförslag kommer stopporsakerna att minska och således verkningsgraden att öka.

Abstract [en]

VIDA Vislanda has a need to know how efficient production is on their new planing mill. Therefore, work to investigate the stopping time lengths and the underlying causes of stoppages at the company is needed. It is also part of the work to submit proposals on measures that could lead to improvements in activity rates and reduction of downtime.

VIDA Vislanda wants to know the efficiency, real meters out and real units out for each dimension and length. The results are presented after this request, but the overall efficiency of the entire measurement period was also calculated, to 52%. If VIDA addresses the major recurring causes of stoppages with our proposed improvements it will decrease the stoppages and thus increase efficiency.

Place, publisher, year, edition, pages
2015. , 64 p.
Keyword [en]
Efficiency rate, stop time measurement, stop time reasons, improvement suggestions
Keyword [sv]
Verkningsgrad, stopptidsmätning, stopptidsorsaker, förbättringsförslag
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:lnu:diva-25240OAI: oai:DiVA.org:lnu-25240DiVA: diva2:614753
Subject / course
Technology
Educational program
Forest and Wood Engineering Programme, 180 credits
Uppsok
Technology
Supervisors
Examiners
Available from: 2015-04-21 Created: 2013-04-06 Last updated: 2015-04-21Bibliographically approved

Open Access in DiVA

fulltext(5006 kB)172 downloads
File information
File name FULLTEXT02.pdfFile size 5006 kBChecksum SHA-512
3eeed0598657b6a6b333c6f2a47e808a8a6114f13f04de4fb0adfadac9453857f39a97fcebdc1813c5de9076ca22282bbdf1192952c8d8cacf4bed093c2a3fb9
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Isaksson, Eddie
By organisation
Department of Forestry and Wood Technology
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 172 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 132 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf