Installationssamordning: Under projekterings och produktionsfasen
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
2012 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Installation coordination : During the planning and production phase (English)
Abstract [sv]

Rapporten har genomförts som ett examensarbete inom högskoleingenjörsprogrammet på Kungliga Tekniska Högskolan med inriktning på byggteknik och ekonomi. Examensarbetet utfördes på uppdrag av Bengt Dahlgren AB i samarbete med projektledare på företaget. Syftet med rapporten har varit att undersöka och förbättra sammorningen av installationer under projekterings- och produktionsstadiet. Det skulle dock vara omöjligt att täcka in alla aspekter av installationssamordningen under dessa stadier under den korta tid som funnits till förfogan för detta examensarbete. De frågeställningar som ställts under arbetets inledande sidor har därför getts en rad avgränsningar för att i första hand komma åt de aspekter som anses viktiga och lyfta upp dessa för utredning.

Under arbetets gång och genom analysen av den empiriska datainsamling som gjorts har en uppfattning av installationssamordningens natur bildats. Till viss del har även samordningen undersökts i sin helhet för att ge en klarare bild av hur resurser fördelas i ett projekt.

Två stycken referensprojekt har legat till grund för detta arbete, varav ett enbart använts för att få en tydligare bild av 3D- samordning i verklig mening och inte enbart genom de litteraturstudier som gjorts på området. 3D- samordning utgör endast en liten del av detta examensarbete. Litteraturstudier har även genomförts av hur visuell planering fungerar under projekt i byggbranschen. Huvudsakligen har arbetet baserats på referensprojekt A som tydligt beskrivs under kapitel 2 - nulägesbeskrivning. Via detta projekt har fakta samlats in genom omfattande intervjuer med projektledare och konsulter, enkätundersökning och iakttagelser av det dagliga arbetet. Målet har varit att få en så tydlig bild som möjligt av hur installationssamordningen går till i dagsläget för att kunna hitta brister och därefter diskutera fram vilka förbättringar som är möjliga att genomföra. Referensprojekt A styrs av en samordnad generalentreprenad vilket givetvis påverkar samordningens uppbyggnad. Inga undersökningar har genomförts av övriga entreprenadformer inom ramen för detta examensarbete.

Samordningen påverkas av resurser som läggs på projektets olika faser i form av tid och pengar. Undersökningar av hur tidplaner används i styrningen av projektet har därför gjorts genom intervjuer. Informationsflödet mellan olika aktörer och utskick av ändringar via PM har även undersökts närmare. Försök har även gjorts till att uppskatta ÄTA- kostnader som uppstår pga. samordningsmissar, något som visat sig vara svårare. Konsulterna har även fått frågan om vilka deras olika behov är och i vilka mjukvaror de själva arbetar under projekteringen. Slutligen har projektledare och konsulter fått ge sina egna förslag på förbättringar av samordningen. Samtliga resultat av den empiriska datainsamlingen presenteras under kapitel 4 - faktainsamling.

Abstract [en]

This report has been carried out as a bachelor’s thesis within the degree program "Constructional Engineering and Economics (TIBEA)" at the Royal Intitute of Technology in Haninge / Stockholm. The work was commissioned by Bengt Dahlgren AB in collaboration with a project manager at the company. The purpose of this report has been to investigate and improve the communication and coordination within the project-state of installations. It would be impossible to cover all aspects of the installation coordination during the short time given for this thesis. Therefore the issues put forward during the introductory pages of this paper has been limited down in order to get primarily at those aspects considered important and raise them for investigation.

During the work process and through the analysis of the empirical data collection made, conclusions about the nature of installation coordination have been reached. To some extent, even the broader aspects of coordination have been looked at. The purpose of this has been to give a clearer picture of how resources are allocated for a project.

Two reference projects have been the basis for this work. One of them has only been used to get a brighter picture of "3D-coordination", in a real world project, unlike the literature studies made on the subject. Also, "3D-coordination" is only supposed to be a small part of this thesis. In general, this thesis is based on reference project A, which is clearly described in chapter 2 - Nulägesbeskrivning (eng. Description of current situation). At this project, facts have been gathered through extensive interviews with project managers and consultants, surveys and observations of their daily work. The goal has been to get as clear of a picture as possible of how the installation coordination works today and thereby be able to pin point flaws and discuss what improvements that can be done. Reference project A is controlled by a coordinated "Design-Bid-Build" (DBB), which of course affects the coordination structure. No studies have been conducted in other forms of contract in the context of this thesis.

Coordination is affected by the resources spent on the projects different phases in terms of time and money. Investigations of how different schedules are used in the management of the project have therefore been made through interviews. The flow of information between different participants in the project and the use of PMs to inform of changes has been closely looked at. Attempts have also been made to estimate the ÄTA-costs (Change costs, or non recurring costs due to changes) that arise due to flaws in the coordination, something that has shown to be hard. The consultants have also been asked the question of what their different needs in the project are and in what software’s they’re working. Finally, project managers and consultants were giving their own suggestions to improve coordination. All the results of the empirical data collection are presented in chapter 4 - Faktainsamling (eng. Fact collecting).

Place, publisher, year, edition, pages
2012. , p. 47
Keywords [en]
Installation coordination, coordination, Installation, planning, production, restaurant kitchen, visual planning.
Keywords [sv]
Installationssamordning, Samordning, Installationer, Projektering, Produktion, Storkök, Visuell planering
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:kth:diva-118653OAI: oai:DiVA.org:kth-118653DiVA, id: diva2:607080
External cooperation
Bengt Dahlgren AB
Subject / course
Constructional Engineering and Design with Business Economics
Educational program
Bachelor of Science in Engineering - Constructional Engineering and Economics
Uppsok
Technology
Supervisors
Examiners
Available from: 2013-02-21 Created: 2013-02-21 Last updated: 2022-06-24Bibliographically approved

Open Access in DiVA

fulltext(3186 kB)1826 downloads
File information
File name FULLTEXT01.pdfFile size 3186 kBChecksum SHA-512
5a255eb8024847f879828de8f5ada0d73578103313cd2847841f56cd7b5a27c7cfa4ddac555941f5ce80ffb06c64002c06fce005c3b26b8681980ad27484b783
Type fulltextMimetype application/pdf

By organisation
Building Technology and Design
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 1826 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 1033 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf