Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
BIM som Informationsbärare in i Förvaltningen: En studie vid Forsmarks Kraftgrupp
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences.
2013 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
BIM as an Information Carrier Throughout the Building Process (English)
Abstract [sv]

BIM, Building Information Modeling, börjar vinna mark inom byggbranschen i Sverige och är en vedertagen process i vart och vartannat byggprojekt. Forsmarks Kraftgrupp står inför både upprustningar av sina anläggningar och nyproduktion av bland annat kontor, verkstad och hotell. BIM framstår nu som en lukrativ metod för att dra ner på projektkostnaderna, men även för att få ytterligare ordning och struktur på den enorma mängd dokumentation som ackumulerat under de dryga trettio åren av drift.

Syftet med detta arbete är att ta fram ett underlag för implementering av BIM på byggkonstruktionskontoret på Forsmarks Kraftgrupp, som även ska kunna användas för att marknadsföra BIM utåt i organisationen. Målet är att peka på nyttan av att tillämpa BIM på Forsmark, med särskild fokus på förvaltning. Som undersökningsmetod har simulering, intervjuer och platsanalys av Forsmark valts.

Då Forsmarks befintliga byggnadsbestånd är omfattande krävs konsensus kring hur framtida förvaltningsmodeller bör se ut och hanteras. I dagsläget används AutoCAD och en andel 3D-modeller har redan producerats. På byggkontoret finns en önskan om att övergå till Revit. Detta arbete visar att en export av 3D-modeller från AutoCAD till Revit är omständligt, men genomförbart om så krävs.

För att kapaciteten med BIM skall kunna utnyttjas är det av vikt att tidigt i projektet ta fram en kravspecifikation. Bland annat bör kravspecifikationen definiera vilka krav som finns på objektsmodellen för att byggnadsinformationen skall kunna tillämpas i förvaltningen. I synnerhet bör specifikationen behandla frågan kring detaljeringsnivå och detaljutförande.

Intervjuerna som hölls med beställare på Forsmark visade att BIM är ett främmande begrepp inom andra avdelningar i organisationen. I dagsläget är det svårt att säga hur förvaltningsmodeller skulle kunna underlätta arbetet för drifts- och underhållspersonal. Att implementera nya metoder på Forsmark tar dessutom tid, då säkerhetsaspekten väger in i alla sammanhang. Dock finns det andra stora vinster med BIM i förvaltningen. I synnerhet  förenklas arbetet med uppdatering av dokumentation, då en ändring endast behöver införas på en punkt i modellen istället för ett flertal ritningar.

Vidare är både byggkonstruktionskontoret och beställarna positiva till ett eventuellt pilotprojekt i BIM. Ett pilotprojekt skulle kunna användas som referensprojekt i framtiden för att vinna gehör på Forsmark i BIM-frågan.

Abstract [en]

The process of BIM, Building Information Modeling, is gaining ground in the building construction industry in Sweden. Forsmarks Kraftgrupp, owner of Forsmark Nuclear Power Plant, is facing both restoration work in the plant and construction of offices, a workshop and a hotel. BIM now appears as an effective method to reduce expenses but also to further bring order and structure to the volumes of documentation that has accumulated during more than thirty years of operation.

The purpose of this bachelor thesis is to provide a basis for implementing BIM at the structural engineering department at the Forsmark plant and to promote BIM to the rest of the organization. The objective is to visualize the usefulness of BIM at the Forsmark plant, specifically in property management. Interviews, a laboratory experiment, and an analysis of the routines at the Forsmark plant were chosen as empirical methodology.

Since the Forsmark plant consists of an extensive amount of buildings, a consensus is required regarding how BIM models for operations and facility management should be designed and managed. Currently, Autodesk AutoCAD™ is used and multiple 3D-models have already been produced. However, the ambition is to switch to Autodesk Revit™ in the near future. This thesis shows that an export of a 3D-model from AutoCAD™ to Revit™ is time-consuming, but achievable if required.

To employ the full capacity of BIM, it is vital to develop a requirements specification early on in the building project. Among other things, the specification should define the requirements of the BIM-model for the purpose of using building information during operations and management. The specification should especially address the level of design and detail.

The interviews with purchasers at the Forsmark plant showed that BIM is a foreign concept in other departments of the organization. Currently, it’s difficult to say in which way the BIM-models would facilitate the work of operations and maintenance staff. Furthermore, implementation of new practices at the Forsmark plant is a lengthy process, due to the safety requirements. However, great gains are possible when using BIM in operations and management. In particular, the task of updating existing documentation is simplified when a modification only has to be made at one point, instead of multiple drawings.

Moreover, both the structural engineering department and the purchasers that were interviewed are in favour of a possible BIM pilot project.  A pilot project could be used as a future reference to gain backing in other departments of Forsmark Kraftgrupp.

Place, publisher, year, edition, pages
2013. , 46 p.
Keyword [sv]
BIM, Building Information Modeling, IFC, Förvaltning, Forsmark, 3D-CAD
National Category
Environmental Analysis and Construction Information Technology
Identifiers
URN: urn:nbn:se:uu:diva-192698ISRN: ISRN UTH-INGUTB-EX-B-2013/03-SEOAI: oai:DiVA.org:uu-192698DiVA: diva2:600508
Educational program
Bachelor Programme in Construction Engineering
Uppsok
Technology
Supervisors
Examiners
Available from: 2013-01-25 Created: 2013-01-24 Last updated: 2013-01-25Bibliographically approved

Open Access in DiVA

fulltext(6612 kB)703 downloads
File information
File name FULLTEXT01.pdfFile size 6612 kBChecksum SHA-512
bd18f92784ad9803d506ce12536c61bab06e242776156604e3ee77cbcf437714b126364f3119e2cfdfddacee713de7030a40785a499c2eb5812a5baaf8e06251
Type fulltextMimetype application/pdf

By organisation
Department of Engineering Sciences
Environmental Analysis and Construction Information Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 703 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 718 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf