Change search
ReferencesLink to record
Permanent link

Direct link
Comparison of injection technologies used for reinforcement in the construction of the tunnel in the Flynta Lycke area
2012 (English)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Place, publisher, year, edition, pages
National Category
Engineering and Technology
URN: urn:nbn:se:hh:diva-19973OAI: diva2:567553
Available from: 2012-11-13 Created: 2012-11-13 Last updated: 2012-11-13Bibliographically approved

Open Access in DiVA

fulltext(5157 kB)386 downloads
File information
File name FULLTEXT01.pdfFile size 5157 kBChecksum SHA-512
Type fulltextMimetype application/pdf

Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 386 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 54 hits
ReferencesLink to record
Permanent link

Direct link