Change search
ReferencesLink to record
Permanent link

Direct link
Analysis of Hook load Signal to reveal the Causes of Restrictions
Norwegian University of Science and Technology, Faculty of Engineering Science and Technology, Department of Petroleum Engineering and Applied Geophysics.
2012 (English)MasteroppgaveStudent thesis
Abstract [en]

Wells that are drilled today are becoming deeper and more complex, and actions to make these wells economically justifiable are desired by oil companies. One method is to reduce the non-productive time during drilling by analysing the hook load response to restrictions in the well. The goal is to recognize abnormal behavior as early as possible to prevent stuck pipe or other incidents that may lead to non-productive time. In present thesis a mathematical model for simulating hook load during normal tripping conditions is made. The model is based on theory about forces acting in the borehole, and properties of the drill string and the wellbore are inserted into it. The goal is to make good hook load simulations for simple tripping conditions, as restrictions most often cause problems during tripping operations. If restrictions were to occur, the changes in hook load during tripping would be identified quickly, and remedies can be started early. A laboratory that simulates tripping out of a nearly horizontal well is buildt and experiments are done. The laboratory experiments are carried out with and without mud flow, to identify also the forces that depends on mud circulation. Washout has been imitated in order to see how restrictions affect the hook load. The model consists of mathematical equations that describe all forces acting on the drill string. The laboratory results were used to adjust the equations, so they match hook load behavior even better. From comparison with the laboratory results it was found that the model creates accurate hook load simulations under simple conditions. Simulations with mud flow during tripping were inaccurate because the forces that occur during circulation were poorly mathematically described in the model. It is not possible to run real time drilling data in the model to see if the model is realistic because block position measurements are missing and some measurement rates are too low, so the equations in the model is not general enough. With improved position measurements and following adjustments in the model, it is likely that the hook load behavior model could be used to reduce the non-productive time during drilling.

Place, publisher, year, edition, pages
Institutt for petroleumsteknologi og anvendt geofysikk , 2012. , 88 p.
Keyword [no]
ntnudaim:7547, MTGEOP Geofag og petroleumsteknologi, Boreteknologi
URN: urn:nbn:no:ntnu:diva-19291Local ID: ntnudaim:7547OAI: diva2:566945
Available from: 2012-11-11 Created: 2012-11-10 Last updated: 2013-06-07Bibliographically approved

Open Access in DiVA

fulltext(9956 kB)1480 downloads
File information
File name FULLTEXT01.pdfFile size 9956 kBChecksum SHA-512
Type fulltextMimetype application/pdf
cover(184 kB)34 downloads
File information
File name COVER01.pdfFile size 184 kBChecksum SHA-512
Type coverMimetype application/pdf

By organisation
Department of Petroleum Engineering and Applied Geophysics

Search outside of DiVA

GoogleGoogle Scholar
Total: 1480 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 85 hits
ReferencesLink to record
Permanent link

Direct link