Småhusproduktion: Utvecklingsmöjligheter hos JM AB
Uppsala University, Disciplinary Domain of Science and Technology, Earth Sciences, Department of Earth Sciences.
2011 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

The Swedish building contractor JM

Region Öst would like to to investigate

the possibilities of developing and

streamlining the production of singlefamily

houses. JM are producing singlefamily

houses with prefabricated frames

at a rate of about two houses per week.

During construction, the different tasks

are performed by JM’s own production

staff but also by various

subcontractors.

When examining the schedules of recently

produced projects, it appears that all

the houses are more or less completed

eight weeks before the customer moves in

to the house. During those eight weeks

several operations are conducted such as

inspections, installation of appliances

and cleaning procedures. The inspection

period constitutes between 25 and 35% of

the complete construction period.

By conducting interviews, it has been

discovered that this final phase is an

essential security buffer for delays and

errors that often occur. Reducing the

time needed for inspection requires that

all activities are properly conducted

with the right quality from start.

After analyzing the results of the

interviews and the comparison of project

schedules, the following conclusions

have been made:

• The time required for

inspections at the end of each project

can be reduced if at the same time

quality inspections and management of

subcontractors are improved during the

whole of the construction period.

• The construction rate is

difficult to increase as it is depending

on the supply capacity from the house

supplier.

• The experience feedback at JM

can be improved, mainly through feedback

to the production staff at the beginning

of new projects

Place, publisher, year, edition, pages
2011.
Keyword [sv]
småhus besiktningstid byggtakt
National Category
Building Technologies
Identifiers
URN: urn:nbn:se:uu:diva-183420ISRN: ISRN UTH-EX-B-2011/41OAI: oai:DiVA.org:uu-183420DiVA: diva2:562736
Educational program
Bachelor Programme in Construction Engineering
Uppsok
Technology
Supervisors
Examiners
Available from: 2012-10-29 Created: 2012-10-25 Last updated: 2012-10-29Bibliographically approved

Open Access in DiVA

fulltext(1149 kB)377 downloads
File information
File name FULLTEXT01.pdfFile size 1149 kBChecksum SHA-512
a7e543d69fca3880ce9eac6c689f71c6e59fe1fdc0c2826b18b397d2489515040df94454346284e8baefcb7482128a0ae5a8f858f4dd162b1c24b35667afd2f7
Type fulltextMimetype application/pdf

By organisation
Department of Earth Sciences
Building Technologies

Search outside of DiVA

GoogleGoogle Scholar
Total: 377 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 438 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf