Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Optimering av Scanias specialaxelmontering i Södertälje genom eliminering av slöseri
KTH, School of Industrial Engineering and Management (ITM), Production Engineering.
2012 (Swedish)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesisAlternative title
Increased productivity of Scania´s special axle assembly line in Södertälje by eliminating waste (English)
Abstract [sv]

Scania är en av världens ledande tillverkare av lastbilar för tunga transporter, bussar samt industri- och marinmotorer. I Södertälje finns bland annat deras axelmontering. Axelmonteringen är indelad i tre monteringslinjer; bakaxelline, framaxelline och specialaxelline.

Syftet med detta examensarbete är att kartlägga nuvarande specialaxelline och utvärdera denna med hjälp av olika metoder från lean produktion.

Därefter identifiera aktiviteter för att minska slöserier, för att optimera monteringslinjen med avseende på volym och/eller bemanning.

Kartläggningen av nuläget visade att drygt 40 % av de aktiviteter som montörerna utför är icke-värdeskapande, där den största slöserikällan är olika typer av rörelse. Det gick även att se att beläggningen på de olika positionerna varierar stort och generellt är låg.

Utifrån dessa insikter arbetades 15 förbättringsförslag fram. Förslagen delades in i tre grupper beroende på om de kan införas med omkostnader, investeringar eller produktförändringar. De förväntade resultaten från förbättringarna är att andelen icke-värdeskapande aktiviteter ska minska med runt 20 %, gångsträckorna med 45 % och kapaciteten öka med 38 %. Av de tre förbättringsförslagsgrupperna står "omkostnader" för störst del i det förväntade resultatet.

En ombalansering av arbetet på monteringslinjen har även utförts för att öka och jämna ut beläggningsgraden.

Abstract [en]

Scania is a world leading manufacturer of heavy trucks, buses and engines for industrial and marine use. In Södertälje you can find, among others, their production of axles. The axle assembly is divided in three assembly lines: rare axle line, front axle line and special axle line (SAX).

This thesis has the aim to map the current state of SAX and to analyze it with tools and methods from lean production. Thereafter activities from reducing waste will be identified, in order to optimize the assembly line in regards of capacity and/or productivity.

The current state analysis showed that more than 40 % of all activities are waste and most of it is motion of some kind. It also showed low and uneven utilization.

Based on the these findings 15 suggestions for improvement were produced and categorized into three groups depending on which kind of resources that is needed when implementing. The improvements are expected to bring down the non-value added activities with approximately 20 %, the walking by 40 % and increase capacity with 38 %.

The work content has also been redistributed to get a higher and more even utilization.

Place, publisher, year, edition, pages
2012. , 65 p.
Series
Examensarbete inom industriell produktion, avancerad nivå, 525
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:kth:diva-103272OAI: oai:DiVA.org:kth-103272DiVA: diva2:559429
Subject / course
Production Engineering
Educational program
Master of Science in Engineering - Design and Product Realisation
Uppsok
Technology
Supervisors
Examiners
Available from: 2012-10-09 Created: 2012-10-09 Last updated: 2012-10-09Bibliographically approved

Open Access in DiVA

fulltext(2422 kB)812 downloads
File information
File name FULLTEXT01.pdfFile size 2422 kBChecksum SHA-512
1386fa4525fa387b24a6f4f2223b11bd10653f20205b42120cbe5b3b3208e9acdbdf02263fc662b3d490edcd0cf8bb82dab59ca340ed7b354b7a34664ede8c9f
Type fulltextMimetype application/pdf

By organisation
Production Engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 812 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 622 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf