Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Projektet att etablera vindkraft: möjligheter och risker med ett förnybart energisystem
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Industrial Engineering & Management.
2012 (Swedish)Independent thesis Advanced level (professional degree), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

This thesis describes the processes of establishing wind farms in Sweden. The workcontains a thorough literature review regarding both the establishing process andproject management, including complex project theory. The main part consists of theexecution of 15 interviews with organizations involved in wind farm establishment.The result of these interviews laid the foundation for a process description identifyingdifferent steps and activities in these types of projects. The outcome was thencompiled in a project model, which includes five phases and four processes.

When analyzing the project of establishing wind farms from the theory of complexprojects one discovers that the amount of different requirements and stakeholdersnecessitates a systematical and dynamical project structure. Since projects are in needof different types of competences there are also many consultants and contractorsinvolved. It is therefore imperative to coordinate these stakeholders efficiently,adapted to the internal structure of the project owner. To be able to take advantageof external competence, both in execution and in the creation of an efficient projectstructure, is an important way of improving ones possibilities for successful wind farmestablishing. These improvements can take the form of savings in project spending’sdue to a more efficient execution of phase activities in the project model, includingbetter functions to terminate inadequate projects early. Improvements can also havethe positive effect of increasing the proportion of projects that are finalized.

Place, publisher, year, edition, pages
2012. , 105 p.
Series
UPTEC STS, ISSN 1650-8319 ; 12022
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:uu:diva-177364OAI: oai:DiVA.org:uu-177364DiVA: diva2:540759
External cooperation
Faveo Projektledning
Educational program
Systems in Technology and Society Programme
Uppsok
Technology
Supervisors
Examiners
Available from: 2012-08-06 Created: 2012-07-11 Last updated: 2012-08-06Bibliographically approved

Open Access in DiVA

fulltext(3090 kB)480 downloads
File information
File name FULLTEXT01.pdfFile size 3090 kBChecksum SHA-512
be3a73e2e8312b6cdf21f2979269670c8e9e026b964e3daea436dcf059f1f259486df60ce52c891be817547025928b15f89daa6a1c186c8c15c399de894c9b99
Type fulltextMimetype application/pdf

By organisation
Industrial Engineering & Management
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 480 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 1100 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf