Produktionslogistik, effektiviseringav materialhantering
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences.
2012 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Production logistics, efficiency of material flow (Bokmål, Norwegian; Norwegian Bokmål)
Abstract [sv]

Atlas Copco Tools is a world leading company in tool manufacturing. The productionin Tierp works hard to improve their assembly to maintain its position. This thesis isa part of their improvement efforts to be a more Lean production.The main focus for this thesis was to identify the material flow in the kanban system,which used to supply the assembly groups, focusing on the material flow to assemblygroup 9 and the assembly group 3. Group 3's material flow within the kanban systemwas perceived to perform better than the group 9. The handling of kanban materialand their working methods in the two groups was identify those differences whichaffected the kanban system.As an alternative material supply a study were done in kiting. This study based on theTierpsverkens sister plant in Hungary concept with kiting as a material supply system.This study is very general and can be used as a base for further investigation of kitingas a material supply in Tierpsverken. The main challenges identified in this study are toadapt the warehouse to provide easy and efficient picking of material, which the studyshows are not the current situation of the warehous.Since only a few differences were identified in the assembly groups several suggestionsregarding the group performing the picking of kanban material; the material supplier .The material suppliers currently works with lists that sorts the material ordered afterwarehouse placement. In that way of sorting they lose the priority in terms of pickingthe first ordered material first. A proposal for order priority were given; by manuallyprint lists several times a day, orders are prevented to have longer waiting time thana few hours. The materials suppliers picked several lists at the same time, suggestionswere given to determine the number of pick / delivery by limiting the number of liststo shorten the cycle time.The suggestions of improvement for the material suppliers are also proposed to beintroduced in the SAP system as a long term solution.

Place, publisher, year, edition, pages
2012. , 53 p.
Keyword [sv]
Materialförsörjning, Kanban, Kittning.
National Category
Mechanical Engineering
URN: urn:nbn:se:uu:diva-176658ISRN: ISRN UTH-INGUTB-EX-M-2012/25-SEOAI: diva2:536366
Educational program
Bachelor Programme in Mechanical Engineering
Available from: 2012-06-27 Created: 2012-06-21 Last updated: 2012-06-27Bibliographically approved

Open Access in DiVA

Produktionslogistik, effektivisering av materialhantering(1471 kB)674 downloads
File information
File name FULLTEXT01.pdfFile size 1471 kBChecksum SHA-512
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Eriksson, Elisabeth
By organisation
Department of Engineering Sciences
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 674 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 573 hits
ReferencesLink to record
Permanent link

Direct link