Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Tillbudsrapportering: Skillnaden mellan två arbetschefsgrupper
Uppsala University, Disciplinary Domain of Science and Technology, Earth Sciences, Department of Earth Sciences.
Uppsala University, Disciplinary Domain of Science and Technology, Earth Sciences, Department of Earth Sciences.
2011 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

In autumn 2010, the Division of Civil Engineering at the Swedish building contractorPEAB made a campaign to increase the number of reported incidents. Informationwas sent to the branch manager who was responsible to enlighten the employees onthe establishment. The goal of PEAB Division of Civil Engineering is to have at least 10reported incidents per accident that generate more than 8 hours absence. Therefore,it is important that the employees understand how the report system for incidentsworks. The number of reported incidents differs between regions. In order toimprove the understanding of why the numbers differ, PEAB Division of CivilEngineering wants to look into the region with the most reported incidents and theregion with the fewest. Through qualitative interviews, the employee’s knowledge andattitude to reporting incidents were reviewed.The study shows large differences in attitude and routines between the two regions.The biggest differences are due to the commitment of the management and how theinformation about the reporting system of incidents reaches their subcontractors. It isshown that the contractors find it confusing what incidents are to be report.In this report we give recommendations how to get an increased number of incidentsreported and later reach up to the goals PEAB Division of Civil Engineering of animproved work environment.

Place, publisher, year, edition, pages
2011. , 40 p.
Keyword [sv]
tillbudsrapportering
National Category
Building Technologies
Identifiers
URN: urn:nbn:se:uu:diva-172594ISRN: ISRN UTH-INGUTB-EX-B-2011/26-SEOAI: oai:DiVA.org:uu-172594DiVA: diva2:515151
Educational program
Bachelor Programme in Construction Engineering
Uppsok
Technology
Supervisors
Examiners
Available from: 2012-05-16 Created: 2012-04-12 Last updated: 2012-05-16Bibliographically approved

Open Access in DiVA

EECR B-2011-26(625 kB)1284 downloads
File information
File name FULLTEXT01.pdfFile size 625 kBChecksum SHA-512
391345eb5c523720f6b316dc11437723743e3f7731f1cc745d4f5d30711c0c4507fca461edb580355da7dbc433a992898309cb5cb1953c7d841144ecefec388b
Type fulltextMimetype application/pdf

By organisation
Department of Earth Sciences
Building Technologies

Search outside of DiVA

GoogleGoogle Scholar
Total: 1284 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 448 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf