Change search
ReferencesLink to record
Permanent link

Direct link
Alternative methods for reduction of operational downtime related to dis-/reconnection of the marine drilling riser
Norwegian University of Science and Technology, Faculty of Engineering Science and Technology, Department of Marine Technology.
2011 (English)MasteroppgaveStudent thesisAlternative title
System for rask tilkobling og frakobling av marin riser i forbindelse med boring i artisk område (Norwegian)
Abstract [en]

The global energy demand is increasing. The oil companies are going into harsher climates and deeper waters to replace their reserves. Much of the undiscovered hydrocarbon reservoirs are believed to be located in the Arctic region. The seasonable ice free waters surrounding the Arctic can be drilled utilizing conventional drilling vessels designed for open water conditions. The region introduces several new operational challenges leading to an increased possibility of the drilling vessel moving off location.

This Master Thesis looks at the challenges related to operating a conventional drilling vessel in the seasonable open waters in the Arctic, using today’s methods for disconnecting and reconnecting the marine drilling riser from the BOP.

The need for a reduction in the operational downtime related to planned and unplanned disconnections is identified and several alternative methods for reducing the dis-/reconnect time are presented and rated.

A concept is chosen based on a wide range of design requirements thus leading to an 89-97 % reduction in costs related to planned and unplanned disconnections, depending on water depth and well type.

The operational subsea control system needs are mapped and several possible control options are presented and evaluated. Based on a Preliminary Hazard Analysis, cost and system complexity, a control system is chosen.

Place, publisher, year, edition, pages
URN: urn:nbn:no:ntnu:diva-15753OAI: diva2:506403
Available from: 2012-02-28 Created: 2012-02-28 Last updated: 2012-02-28Bibliographically approved

Open Access in DiVA

fulltekst(5272 kB)1866 downloads
File information
File name FULLTEXT01.pdfFile size 5272 kBChecksum SHA-512
Type fulltextMimetype application/pdf

By organisation
Department of Marine Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 1866 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 172 hits
ReferencesLink to record
Permanent link

Direct link