Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Analysis of a load frequency control implementation in Swedish run-of-river hydropower stations
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Electricity.
2012 (English)Independent thesis Advanced level (professional degree), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

The total amount of frequency deviations have during the last decade increased exponentially in the Nordic synchronous power system. The transmission system operators have therefore decided to implement load frequency control as a new automatic control system to stem these frequency deviations.

The aim of this feasibility study is to analyse the effects of an LFC implementation in Swedish hydropower stations by using a more dynamic river governing. The method chosen to analyse the effects of LFC-governing was to create a Matlab Simulink hydropower station library including dynamic modules for rivers and turbine governors. The library is then used to create a river reach that is implemented in an ENTSO-E model for the Nordic frequency reserves. The governing of the river uses economical dispatch theory to optimally distribute a LFC setpoint signal from the ENTSO-E model to the different hydropower stations.

Results show that the developed method has a future potential to create more frequency controlled reserves. By creating a central governing unit it was possible to govern frequency controlled reserves over an entire river reach under certain scenarios, but there are still many obstacles to overcome before an actual implementation. The method does however show both the possibilities and drawback of frequency controlled reserves in cascade coupled hydropower systems.

Place, publisher, year, edition, pages
2012. , 63 p.
Series
UPTEC ES, ISSN 1650-8300 ; 12004
Keyword [en]
Hydropower, power system, frequency controlled reserves, load frequency control, Matlab Simulink
National Category
Energy Systems
Identifiers
URN: urn:nbn:se:uu:diva-168296OAI: oai:DiVA.org:uu-168296DiVA: diva2:492588
Educational program
Master Programme in Energy Systems Engineering
Uppsok
Technology
Supervisors
Examiners
Available from: 2012-02-22 Created: 2012-02-08 Last updated: 2012-02-22Bibliographically approved

Open Access in DiVA

Analysis of a load frequency control implementation in Swedish run-of-river hydropower stations(3246 kB)2576 downloads
File information
File name FULLTEXT01.pdfFile size 3246 kBChecksum SHA-512
0f8b2ed3a86577be4108edf5980f3313f676b9e3fa1ce9bfae334c777e05f6b977464ddb311ac3a377b833c05d697ad2b46076092feef675cb101fbfa18ebe94
Type fulltextMimetype application/pdf

By organisation
Electricity
Energy Systems

Search outside of DiVA

GoogleGoogle Scholar
Total: 2576 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 1068 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf