Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Fjärrvärme - ny lokalisering av kraftvärme i Enköping
Uppsala University, Disciplinary Domain of Science and Technology, Physics, Department of Physics and Astronomy.
2009 (Swedish)Independent thesis Advanced level (professional degree), 20 credits / 30 HE creditsStudent thesisAlternative title
District Heating - New Localisation of a CHP Plant in Enköping (English)
Abstract [en]

The municipality of Enköping is presently working out a new layout plan for the town of Enköping and new residences are planned in the harbour area. Because of these plans, the municipal energy company ENA Energi may have to move its location from the harbour to another part of the city.

The aim of this degree project is to investigate the possibility of building a new CHP plant in another area of Enköping. The future demand on district heating and infrastructure at the new location have been projected. A new CHP plant has been dimensioned and economic analyses concerning the project have been made.

Results show that the future demand of district heating in Enköping will differ a little from the present needs. In 2030, the district heating production is expected to be c. 250 GWh, a reduction of 5 % as compared to today. The future system will have a maximum power need of 70 MW. Together with a 15 MW wood powder fired boiler and a 55 MW oil fired boiler, a CHP plant of 40 MW will satisfy the demands of Enköping.

Building a new CHP plant involves large costs. To finance the additional cost of a new CHP plant in 2015, the district heating price has to be increased to approximately 900 SEK/MWh, a raise of 64 %. If the additional cost is to be financed by the new residences in the harbour area, it will correspond to a rent increase of c. 2200 SEK/month.

Place, publisher, year, edition, pages
2009. , 89 p.
Series
UPTEC ES, ISSN 1650-8300 ; 09030
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:uu:diva-162600OAI: oai:DiVA.org:uu-162600DiVA: diva2:461028
Educational program
Master Programme in Energy Systems Engineering
Uppsok
Technology
Supervisors
Examiners
Available from: 2011-12-01 Created: 2011-12-01 Last updated: 2011-12-01Bibliographically approved

Open Access in DiVA

fulltext(3040 kB)768 downloads
File information
File name FULLTEXT01.pdfFile size 3040 kBChecksum SHA-512
44c42b41dad113cc274c82e02ebeefc234c74624e57d26f2afc144e7ed5c1d4fc3fd4f9cda7fad5fe60ede3fc27f77a2c825177cfc5d11a64cead0fdf0b95450
Type fulltextMimetype application/pdf

By organisation
Department of Physics and Astronomy
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 768 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 465 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf