Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Managing Forecast Errors at the Nordic Power Market at Presence of Large Amounts of Wind Power
Institutionen för energi och teknik, SLU.
2008 (English)Independent thesis Advanced level (professional degree), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

The aim of the study is to investigate possibilities to manage forecast errors at the Nordic power market based on the size of the actor. This is part of a larger question at hand, whether the Nordic power market structure is suitable to support large wind power installations.

An increased amount of wind power will unavoidably generate an increased amount of forecast errors and raise the demand for adjustment and regulating power. The investigation is carried out in three steps.

·First a scenario is created containing eight actors that is balance responsible for varying size of wind power production. Forecast error volumes are modeled associated with each actor in the scenario.

·Secondly, conditions at the intraday market and the regulating market during 2006 are investigated and the result is used as input for the next step.

·Last, price models are developed and used to calculate future imbalance costs associated to each actor, and the cost saving potential in different options. Because of uncertainties about the future intraday/regulating market situation, several calculations are carried out with different perspectives for the model calibration, different distributions of the forecast error volumes between the intraday market and the regulating market, and different options for managing the forecasts error.

The results indicate that it is a major difference in the cost saving potential if the forecast error is “sold” or if the adjustment is “bought”. The cost saving potential differs significantly between the smaller and the larger actors.

Place, publisher, year, edition, pages
2008. , 104 p.
Series
UPTEC ES, ISSN 1650-8300 ; 08010
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:uu:diva-162594OAI: oai:DiVA.org:uu-162594DiVA: diva2:461000
Educational program
Master Programme in Energy Systems Engineering
Uppsok
Technology
Supervisors
Examiners
Available from: 2011-12-01 Created: 2011-12-01 Last updated: 2011-12-01Bibliographically approved

Open Access in DiVA

fulltext(2582 kB)505 downloads
File information
File name FULLTEXT01.pdfFile size 2582 kBChecksum SHA-512
3c3927e8e17c8f45f6b31680bc051ae08886ec666598fb5df0742df63dd081699cd818cd0fa629ee64f2ef7f81aeb1fb28da57412354d186cd6169598040289f
Type fulltextMimetype application/pdf

Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 505 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 433 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf