Change search
ReferencesLink to record
Permanent link

Direct link
Effektivisering av produktionsgrupp: Improving the efficiency of a production group
Linnaeus University, Faculty of Science and Engineering, School of Engineering.
2011 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

The report is about efficiency of a current production group where there is no clear production flow and there are some buffers between the operations. The efficiency is done with the help of a tool that is called

Work process of flow production which is used by Atlas Copco CTO. The most obviously results are that the lead time drops from 25 hours to 425 minutes and that the balancing loss decreases from 85 % to 8 %. The report focus on decreasing transports, decreasing buffers, more reliability in lead time and quality. And a more stimulating labour content for the workers is another result.

Place, publisher, year, edition, pages
Keyword [sv]
Ledtid, Balanseringsförlust, Flödesproduktion, Linjebalansering, Just In Time, Kanban.
URN: urn:nbn:se:lnu:diva-13023OAI: diva2:426652
Subject / course
Mechanical Engineering
Educational program
Industrial Engineering Programme with specialization in Management and Production, 180 credits
2011-06-09, Atlas Copco, Gängesvägen 4, Ljungby, 09:00 (Swedish)
Available from: 2011-08-25 Created: 2011-06-24 Last updated: 2011-08-25Bibliographically approved

Open Access in DiVA

fulltext(1045 kB)531 downloads
File information
File name FULLTEXT01.pdfFile size 1045 kBChecksum SHA-512
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Svensk, Jens
By organisation
School of Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 531 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 301 hits
ReferencesLink to record
Permanent link

Direct link