Abstract

 

The fuel is put into the process through a burner pipe and this burner pipe is modified to reach a more efficient combustion. The primary target is to enable burning of heterogeneous alternative fuels and increase the production level. Other positive effects from this type of optimization is lowered specific fuel consumption and lowered CO2 emissions.

A redundant burner is chosen for the project and overall the project steps are the following:

1. Installing a Jet air nozzle ring in a way so it can move both axially and radially due to temperature changes.

2. Remove the present refractory from the burner and order a new form to decrease the weight of the burner

3. Place a K6 blower in operating the axial channel.

4. Install Gauging equipment (Temp, pressure, ampere blower etc)

5. Carefully observe process values during the modified burners run in time.

6. Evaluate the results of the project

7. With the help of proven potential in the kiln system be able to convince management of the proceeds to invest in a new burner

8. If point 7 is fulfilled with the help of experience, be able to operate as a projectcoordinator in the purchase of a professional burner. This task will include coordinating the project group in various meetings and then lead to an RFQ (Request For Quotation).

Results from the project show the great potential in an optimization of a burner at a cement plant. A production increase of 5% could be seen together with a lowered specific energy consumption which is extremely satisfactory results.

Unfortunately a breakdown of the system occurred a bit down the path of optimisation that resulted in damages to the kiln. At this stage the optimization was stopped and the old burner was put back after finished kiln repair.

Finally crucial to underline is that the proven results in this study convinced the Group Management of buying a new burner. The benefits from a professional tailor made burner are far greater than the cost of buying it. The payback time is roughly around a year for such an investment depending on current market conditions.

In this report focus is put on the combustion process at a cement plant. Combustion is the heart of the cement making process and absolutely crucial to have under full control and well optimized.

Place, publisher, year, edition, pages
2010. , 92 p.
Series
UPTEC ES, ISSN 1650-8300 ; UPTEC ES 11 006
Keyword [en]
Cement, Combustion, Energy, Fluid Mechanics, Process Industry
Identifiers
URN: urn:nbn:se:uu:diva-148689OAI: oai:DiVA.org:uu-148689DiVA: diva2:402796
Uppsok
Technology
Supervisors
Examiners
Available from: 2011-03-09 Created: 2011-03-09 Last updated: 2011-03-09Bibliographically approved

Open Access in DiVA

fulltext(4161 kB)11578 downloads
File information
File name FULLTEXT01.pdfFile size 4161 kBChecksum SHA-512
7b01c154dddd82c29fd5cc165436a102ff3c57b8901d66863d9723bd9612af3065e53d80c90bc37d961707adc9150d173467fd6d22ae6d16d014bc4df2c09df4
Type fulltextMimetype application/pdf

Other links

Examensarbetet är tidigare publicerat på SLU

Search in DiVA

By author/editor
Grönwall, Fred

Search outside of DiVA

GoogleGoogle Scholar
Total: 11578 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 326 hits
ReferencesLink to record
Permanent link

Direct link