Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Kvalitetssäkrad projektering av lågenergibyggnader
Karlstad University, Faculty of Technology and Science.
2011 (Swedish)Independent thesis Basic level (university diploma), 15 credits / 22,5 HE creditsStudent thesis
Abstract [sv]

Karlstads kommun ingår som en del i en global klimatstrategi för att omsätta EU:s klimatambitioner. En innebörd av detta är att Karlstads kommun har antagit ett generellt krav på en lägre specifik energianvändning av lokaler och byggnader på 80 kWh/m2 och år.

 

Rapport har gjorts i samarbete med Karlstads kommuns teknik- och fastighetsförvaltningen med syfte att identifiera problemen som uppstår i projekteringsprocessen. Syftet är även att ge förslag på åtgärder som förbättrar denna process samt att se om en energisamordnare kan vara en del av lösningen och i så fall på vilket sätt.

 

Till grund för rapporten genomfördes ett antal intervjuer med projektledare på teknik- och fastighetsförvaltningen samt med typiska projektörer som teknik- och fastighetsförvaltningen samarbetar med. Landstingsfastigheter intervjuades för att göra en jämförelse mellan dessa båda organisationers arbetssätt. Under intervjuarbetet uppmärksammades ett antal återkommande orsaker till varför det inte fungerar tillfredställande i byggprocessen. Bearbetade intervjuer har med hjälp av litteraturstudier och seminarier inom ämnet resulterat i ett antal åtgärdsförslag som syftar till att ge en förbättrad projekteringsprocess.

 

Några identifierade problem som är återkommande i rapporten är att det saknas en strukturerat metodisk arbetsform. Arbetsmetoderna i projekteringsarbetet bör förändras så att olika aktörer redan i ett tidigt projekteringsskede samverkar med varandra i en integrerad process

En metod efterfrågas där byggnaden får växa fram tillsammans med energi- och verksamhetsbehovet. Rutiner för uppföljningsarbetet behöver förbättras, likaså målbilden av vad man vill uppnå. Förändrade verksamhetskrav tillsammans med frångående av projektmodellen för att tidigarelägga projekt ger konsekvenser. Bristande kompetens och en tydligare styrning av uppföljningsarbetet av energikravkrav är ytterligare identifierade uppmärksammade problem i projekteringen. Sammantaget ges energifrågorna en liten tyngd i projekteringen.

 

En förbättrad projekteringsprocess ges av en kombination av åtgärdsförslag. En integrerad samarbetsform som sätter projektet i fokus och blir ett gemensamt uppdrag föreslås vilket även präglar arbetssätet. Energilotsen har den systematiska handledning för energifrågorna som krävs och efterfrågas. Energiverifikat 09 visar ledningens mål och vilja. Verifikatet erbjuder även en systematisk process med rutiner och metoder för att säkerställa att byggnadens olika system fungerar i samverkan och att det vid strategiskt viktiga skeden sker energianalyser. Dokumentet ger även den dokumentation av energifrågorna i projektets olika skeden som efterlysts.

 

Beroende på vilken ambitionsnivå man väljer för byggnadens energi- och inneklimatfrågor bör åtgärdsförslagen anpassas efter teknik- och fastighetsförvaltningens möjligheter.

 

Verksamhetens och energifrågorna bör ges en egen punkt på dagordningen som bevakas av Energisamordnaren och verksamhetens representant. Verksamhetens och lågenergiutformningens olika förutsättningar bör mötas redan i programarbetet.

 

Abstract [en]

Karlstad City has agreed to participate in a global climate strategy to implement the EU's climate ambitions. One effect of this is that the municipality of Karlstad has adopted general requirements for lower energy use in facilities and buildings. It shall not exceed 80 kWh/m 2/ year.

 

This report has been made in cooperation with Karlstad Municipality technology and property management with the purpose to identify the problems that arise in the design process. The aim is also to propose measures to improve this process and to find out whether an energy coordinator could be part of the solution.

 

The basis for this report is a number of interviews with project managers on the technology and property management, and with designers that they cooperate with. Project managers at Landstingsfastigheter were interviewed in order to make a comparison how these two organizations work. During the interview process several reasons were identified why the work didn’t work satisfactionally in the construction process. Processed interviews, literature studies and seminars on the subject resulted in a number of proposed measures aimed at providing an improved planning process.

 

The major problem recurrent in the report is the lack of a structured work process. The work methods of the design process must be changed so that the various actors interact, at an early stage, with each other in an integrated process. There is a request for a method in which the building along with energy and business needs is simultaneously developed. Procedures to follow up and evaluate work and the objective needs to be improved. Changing business requirements and abandoning the project model to advance the project has consequences. Lack of skills and a better control of the follow-up work of energy requirements are additional requirements identified high-profile issues in the design.  Overall, energy issues are given a small weight in design.

 

An improved design process is provided by a combination of actions. An integrated form of cooperation which puts the project in focus and is becoming a common task is proposed which characterises the seat. The energy pilot is the systemic tutoring for energy needed and requested.  Energiverifikat 09 show management's objectives and will. Verifikatet also offers a systematic process of arrangements and procedures for ensuring that the different systems work together and that when strategically important stages takes place energy analyses. The document also provides the documentation of energy issues in various stages of the project requested.

Depending on the level of ambition chosen for the building's energy and indoor climate issues action proposals should be adapted according to Technology and real estate management opportunities. Operational and energy issues should be a separate issue on the agenda that the energy coordinator and the business representative are responsible for.

Operational issues and the requirements for lower energy use different conditions should be reconciled at an early stage.

 

 

Place, publisher, year, edition, pages
2011. , p. 113
Keywords [sv]
Energisamordnare, energieffektivt byggande, byggprocessen, funktionskrav, lågenergibyggnader, energiberäkningar och uppföljning.
National Category
Building Technologies
Identifiers
URN: urn:nbn:se:kau:diva-6975Local ID: BYI-19OAI: oai:DiVA.org:kau-6975DiVA, id: diva2:396104
Subject / course
Building Engineering, Bachelor of Science
Presentation
(Swedish)
Uppsok
Technology
Supervisors
Examiners
Available from: 2011-02-18 Created: 2011-02-08 Last updated: 2016-04-01Bibliographically approved

Open Access in DiVA

fulltext(1519 kB)456 downloads
File information
File name FULLTEXT01.pdfFile size 1519 kBChecksum SHA-512
5117e775eb19a31c31546fc762c49c1f83b631cb727cad22390efa5172cbf09210126d3577f6d29a1eaaf5785bf3108a6930a937f57c80d7af4710ad76f6990f
Type fulltextMimetype application/pdf

By organisation
Faculty of Technology and Science
Building Technologies

Search outside of DiVA

GoogleGoogle Scholar
Total: 456 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 487 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf