Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Produktion av dricksvatten och förnybar el i Bläsinge fiskehamn
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Solid State Physics.
2010 (Swedish)Independent thesis Advanced level (professional degree), 20 credits / 30 HE creditsStudent thesisAlternative title
Production of drinking water and renewable electricity in the fishing port Bläsinge (English)
Abstract [en]

The fishing port of Bläsinge is located on the east coast of Öland, Sweden’s second largest island. Today the port has a limited supply of freshwater. The economic association of the fishing port wants to expand their business, so that they will also include tourist services. To do this the harbor will need a more independant source of freshwater, with a higher quality than the present well. This work includes inquiries of two solutions for extracting freshwater from the Baltic Sea, the ClearCrystals™ technology and reverse osmosis.

The analysis of the electric energy use shows that the fishing harbor has a need for electricity, which is 32900 kWh, using the chosen water purifying technology, which is reverse osmosis. The need for electric energy will be concentrated to the warm months; the most electricity intense processes are the refrigeration and the ice-making.

To meet the wish of the fishing association, to reduce their cost for electric energy and at the same time get an environmentally friendly interface, the possibilities for alternative electric energy production has been investigated. The most relevant solution for the association has been small scale wind power, but the possibilities for solar cells are also an interesting solution. A wind turbine that will be able to produce the yearly amount of electric energy that the port needs, should have a rated power at around 20 kW and a tower height of at least 18 m.

Place, publisher, year, edition, pages
2010.
Series
UPTEC ES, ISSN 1650-8300 ; 10014
Keywords [sv]
vattenavsaltning, förnybar elproduktion
Identifiers
URN: urn:nbn:se:uu:diva-127078OAI: oai:DiVA.org:uu-127078DiVA, id: diva2:328622
Uppsok
Technology
Supervisors
Examiners
Available from: 2010-08-12 Created: 2010-07-05 Last updated: 2010-08-16Bibliographically approved

Open Access in DiVA

fulltext(430 kB)611 downloads
File information
File name FULLTEXT01.pdfFile size 430 kBChecksum SHA-512
00f8a0ad70f2760faf7714807416305f21db7da6905e3006e3641a12c060d9f3dd37f27f9be88e5062698f1b979af3e95180fa8299ce448826cc27ee36e0af8e
Type fulltextMimetype application/pdf

By organisation
Solid State Physics

Search outside of DiVA

GoogleGoogle Scholar
Total: 611 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 990 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf