Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Underlag för framtagning av målningslina: Hantering och layout
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Industrial Engineering & Management.
2010 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

Seabased Industry AB develops system for extracting electrical energy from ocean waves with a Wave Energy Converter (WEC). The components is bought from subcontractors and then assembled into wave energy converters, buoys and marine substations by Seabased. In the future Seabased will produce more of the components themselves to reduce costs and to have better control over tolerances. The production line will also include the painting of the WECs and substations, which is performed in a painting line.

The purpose of this thesis work is to study what is required to build a painting line, regarding the types of stations, transporting types and the space needed. This will result in layouts for the painting line.

To receive the necessary information about production theory and corrosion and surface treatment, literature concerning this area has been studied. In addition a study visit has been done to see how a painting line may look like. This has been the basis for the solutions of the layouts.

Since the design of the WEC, the production rate and the requirements of the painting system may change there are many parameters to consider. This led to several proposals of the layouts, to meet the requirements which may change.

Considered the suggestions of solutions that have been presented in this report, Seabased can continue working towards developing a more optimal solution of the layout for the painting line that meets the requirements at issue.

Place, publisher, year, edition, pages
2010. , p. 53
Keywords [sv]
Ytbehandling, genomloppstid, transport, layout
Identifiers
URN: urn:nbn:se:uu:diva-126620ISRN: UTH-INGUTB-EX-M-2010/07-SEOAI: oai:DiVA.org:uu-126620DiVA, id: diva2:325626
Uppsok
Technology
Supervisors
Examiners
Available from: 2010-06-21 Created: 2010-06-18 Last updated: 2011-03-10Bibliographically approved

Open Access in DiVA

fulltext(1372 kB)546 downloads
File information
File name FULLTEXT01.pdfFile size 1372 kBChecksum SHA-512
9207169e8fa2c5db5ef6c4279e382c312ae4b0e639c27b0e3b75d9796ec30e361c30a51b55b8415444262b20be74a9b3d2861e312c4689c95eeae71c96ef7098
Type fulltextMimetype application/pdf

By organisation
Industrial Engineering & Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 546 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 959 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf