Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Kartläggning och förslag till förbättring av projektflödet
Linnaeus University, Faculty of Science and Engineering, School of Engineering.
Linnaeus University, Faculty of Science and Engineering, School of Engineering.
2010 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Survey and improvement of the project flow (English)
Abstract [sv]

Syftet med arbetet är att kartlägga och att finna möjligheter till förbättringar i projektflödet. Arbetet berör de delar av företaget som befinner sig i ett tidigt skede av projektflödet eftersom ändringar i dessa skeden kan göras till en liten kostnad. Informationsinsamling har skett genom fria samtal, dock med vissa förberedda frågor. Information har inhämtats från flera delar av projektflödet så som försäljning, projektledning och konstruktion. Vi har kommit fram till att det är värt att lägga mer resurser på förbättringsarbete och se över ansvarsfördelningen för detta. Man bör även se över reklamationerna som till antalet är för många och många av felen är likartade.

Abstract [en]

The main purpose of this thesis is to survey and find possibilities of improvements in the project flow. The report only touches the parts of the company which are located in the early parts of the project flow, hence alterations can be made at a low cost. The gathering of information was made by open conversations, with some prepared questions. The information has been gathered from several parts of the company such as sales, project management, and construction et cetera. We consider it to be profitable to increase the resources in the improvement work. The company should also investigate the distribution of responsibility in the work of improvement. The complaints are too many and many of the faults are similar.

Place, publisher, year, edition, pages
2010. , p. 2
Keywords [en]
Project flow, continuous improvements, follow up, complaints, quality
Keywords [sv]
Projektflöde, ständiga förbättringar, uppföljning, reklamationer, kvalitet
Identifiers
URN: urn:nbn:se:lnu:diva-5828OAI: oai:DiVA.org:lnu-5828DiVA, id: diva2:322235
Uppsok
Technology
Supervisors
Examiners
Available from: 2010-06-11 Created: 2010-06-04 Last updated: 2010-06-11Bibliographically approved

Open Access in DiVA

fulltext(79 kB)333 downloads
File information
File name FULLTEXT01.pdfFile size 79 kBChecksum SHA-512
6dd9e524e869380bad41b8e0bfb192aacff2ddf92a09fc050dad560ddc9aca9587e0b71a69bfd0790a1ec0dd714feac047c90087f64961ae080ff58b2df33ff8
Type fulltextMimetype application/pdf

By organisation
School of Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 333 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 403 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf