Förändrade förutsättningar för implementering av teknologier i ett byggprojekts produktionsskede
KTH, School of Industrial Engineering and Management (ITM).
2019 (Swedish)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesisAlternative title
Changed prerequisites for implementing technologies in a construction project during the production phase (English)
Abstract [sv]

Bakgrund: För att förbättra kommunikationen mellan aktörer i byggprojekt under produktionsskedet finns stor potential i att implementera nya information- och kommunikationsteknologier. I litteraturen förklaras implementeringar av dessa teknologier utifrån flera olika aspekter. En aspekt vars inverkan dock inte studerats i stor utsträckning är hur den tidpunkt som byggprojektet befinner sig i påverkar implementeringen, trots att tidsaspekten är en av projektet som organisationsforms viktigaste särdrag.

Syfte: Studien syftar till att utforska förutsättningarna för implementering av informations- och kommunikationsteknologier i byggproduktion under olika faser av produktionsskedet.

Metod: Studien utgår från teorier kring innovationsprocessen, implementering av innovation och teknologi tillsammans med teorier kring projektbaserat arbete och spårbundenhet i organisationer. Studien är genomförd som en fallstudie på byggbolaget Skanska där två byggprojekt undersöks i dess produktionsskede. Intervjuer genomfördes där faktorer bakom implementeringsprocessen av informations- och kommunikationsteknologier och förändringar av förutsättningar för denna process mellan två tidpunkter, produktionsstarten och mitt i produktionsskedet, kunde visas.

Slutsatser: Studien visar att förutsättningarna för implementering av teknologier i byggproduktion förändras under produktionsskedet. Två huvudsakliga skillnader i förutsättningar identifierades, större tillgänglighet av tidsresurser och förekomst av aktiviteter som formar normen vid produktionsstarten jämfört med mitt i produktionsskedet. Studien visar även att dessa förutsättningar har en stor inverkan på implementeringen av teknologier vilket hindrar implementering av teknologier efter produktionsstarten.

Abstract [en]

Background: To improve communication between actors in construction projects during production phase there is great potential of new information and communication technologies. The literature explains the implementations of these technologies from several aspects. One aspect, which needs further research, is how the period which a construction project is in impacts the implementation, since the time aspect is one of the most important characteristics of a project.

Purpose: This study aims to explore the prerequisites for implementing new information and communication technologies in production during different periods of the production phase of a construction project.

Methodology: This study is based on theories on the innovation process, implementation process of innovation and technology together with theories on project management and path dependency in organizations. The study was conducted as a case study at the construction company Skanska, where two construction projects were investigated in their respective production phase. Interviews were conducted where factors behind the implementation process of information and communication technologies were shown. Changed prerequisites for this process between two of the project’s phases, the production start and the middle of production phase, were also revealed.

Conclusions: This study shows that the prerequisites for implementing technologies in construction change during the construction phase. Two major differences were identified; greater availability of time resources and the presence of activities that form the norm, at the start of production compared to the middle of the production phase. This study also shows that these prerequisites have a major impact on the implementation of technologies, which result in difficulties in implementing the technologies after the start of the production.

Place, publisher, year, edition, pages
2019. , p. 57
Series
TRITA-ITM-EX ; 2019:351
Keywords [en]
Path dependency, Project phases, Adoption of innovation, Implementation of innovation, Adoption of technology, Construction innovation, Temporary organization.
Keywords [sv]
Spårbundenhet, Projektfaser, Adoption av innovation, Implementering av innovation, Adoption av teknologi, Bygginnovation, Temporär organisation.
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:kth:diva-264078OAI: oai:DiVA.org:kth-264078DiVA, id: diva2:1371979
External cooperation
Skanska
Supervisors
Examiners
Available from: 2019-11-21 Created: 2019-11-21 Last updated: 2019-11-21Bibliographically approved

Open Access in DiVA

fulltext(1714 kB)5 downloads
File information
File name FULLTEXT01.pdfFile size 1714 kBChecksum SHA-512
345b082753d3d6fe2615d4fb4c43da1d3ce9405ef38835d1791b20950489a27b5ecf9c602c794cc03d6c4f5b307c231228e339954f8de83f4f8e1758bc3efb28
Type fulltextMimetype application/pdf

By organisation
School of Industrial Engineering and Management (ITM)
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 5 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 10 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf