Experimental Assessment of Water Hammer-Induced Column Separation in Oil-Hydraulic Pipe Flow
Linköping University, Department of Management and Engineering, Applied Thermodynamics and Fluid Mechanics. Linköping University, Faculty of Science & Engineering. Epiroc Rock Drills AB, Sweden.
Linköping University, Department of Management and Engineering, Applied Thermodynamics and Fluid Mechanics. Linköping University, Faculty of Science & Engineering.ORCID iD: 0000-0003-4656-7662
Epiroc Rock Drills AB, Sweden.
Linköping University, Department of Management and Engineering, Applied Thermodynamics and Fluid Mechanics. Linköping University, Faculty of Science & Engineering.ORCID iD: 0000-0001-5526-2399
2019 (English)In: Journal of Fluids Engineering, ISSN 0098-2202, E-ISSN 1528-901X, Vol. 141, no 10, article id 101107Article in journal (Refereed) Published
Abstract [en]

Cavitation erosion through water hammer and column separation is a major concern in hydraulic applications such as percussive rock drilling. Cavitation aspects must be considered both in early and late design stages, which require deep knowledge and tools for prediction. In this study, an oil-hydraulic test equipment for water hammer assessment was designed using state-of-the-art simulation tools. Several tests were performed, with and without column separation, showing good repeatability on measured pressures. At higher flow rates, column separation was the dominating feature and several high-ressure peaks with subsequent time delay reduction could be observed. These patterns were affected by the oil temperature, with most substantial changes at lower temperature ranges (amp;lt; 32 degrees C). Standard transmission line simulations managed to predict the water hammer, but as expected not the column separation, which is the theme of future work using this setup.

Place, publisher, year, edition, pages
ASME , 2019. Vol. 141, no 10, article id 101107
National Category
Energy Engineering
Identifiers
URN: urn:nbn:se:liu:diva-160585DOI: 10.1115/1.4043854ISI: 000484559300008OAI: oai:DiVA.org:liu-160585DiVA, id: diva2:1362728
Note

Funding Agencies|Epiroc Rock Drills AB, Orebro, Sweden

Available from: 2019-10-21 Created: 2019-10-21 Last updated: 2022-02-10

Open Access in DiVA

fulltext(1927 kB)613 downloads
File information
File name FULLTEXT01.pdfFile size 1927 kBChecksum SHA-512
e326d7785ca36354817f3de3eb992819f1f246899b91ccddd0228a8acee7b10962d5d4b6fc2e3d31b0bf114d4b98c0e931a21ad8ee63524e851fc49ffc41e00e
Type fulltextMimetype application/pdf

Other links

Publisher's full text

Search in DiVA

By author/editor
Jansson, MarcusAndersson, MagnusKarlsson, Matts
By organisation
Applied Thermodynamics and Fluid MechanicsFaculty of Science & Engineering
In the same journal
Journal of Fluids Engineering
Energy Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 614 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

doi
urn-nbn

Altmetric score

doi
urn-nbn
Total: 425 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf