Digitala Vetenskapliga Arkivet

Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Förseningstimmar på mötesseparerade 2+1-vägar: Hur förseningskostnaden påverkas av ombyggnad till 2+2-väg i relation till investeringskostnaden
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
2019 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Delay hours on 2+1-separeted roads : How the cost of delay hours are affected by reconstructing to 2+2-roads in relation to the investment cost (English)
Abstract [sv]

Från slutet av 1990-talet har en stor mängd av de icke-separerade 13 meter breda vägarna byggts om till mötesseparerade vägar, där trafiken i varje riktning separeras med en mittremsa. Mötesseparerade vägar har varit ett mycket lyckat projekt för trafiksäkerheten och bidragit med en stor minskning av svårt skadade och döda i trafiken. Det finns många mötesseparerade vägar i Sverige. Vid olyckor på 2+1-vägar blir det svårt för trafiken att vända på vägen vilket leder till stopp och gör det även svårt för Blåljusmyndigheten samt bärgningsbilar att ta sig fram. Dessa olyckor leder till förseningstimmar och i sin tur till samhällskostnader. Det här examensarbetet är skrivet för Trafikverket för att granska 2+1-vägar i Trafikverkets Region Öst. Rapporten tar fram och jämför minskning av förseningskostnader efter en ombyggnad från 2+1- till 2+2-väg, rapporten tar även fram och jämför förseningskostnaden med investeringskostnaden för ombyggnationen. Resultatet för den här studien har framförts genom litteraturstudier, analys av data från Trafikledningen, webbverktyg och genom användning av Microsoft Excel för kalkylering av förseningstimmar och -kostnader för utvalda vägar och sträckor. Resultatet från rapporten visar om det är värt att undersöka en 2+1-väg för ombyggnation från 2+1- till 2+2-väg ur förseningskostnadsperspektiv. Detta redovisas genom en generell jämförelse per mil 2+1-väg baserad på väg 50, 55 och 56 i Trafikverkets Region Öst. Rapporten innehåller även en analys över de fem mest drabbade olycksplatserna på E18:s 2+1 sträckor. Analysen av dessa visade att alla fem sträckor låg mellan Köping och Västerås i Västmanland.

Abstract [en]

From the late 1990s, a large part of the non-separated 13-meter-wide roads have been reconstructed into meeting separated roads, where traffic in each direction is separated by a middle strip. Meeting separated roads have been a very successful project for road safety and have contributed to a large reduction in severely injured and casualties in traffic. There are many meeting separated roads in Sweden. In the case of accidents on 2+1-roads, it becomes difficult for the traffic to turn around on the road, which leads to a stop and makes it difficult for the emergency services and tow trucks to reach the scene of the accident. These accidents lead to delay hours and, in turn, to community costs. This thesis is written for the Swedish Transport Administration to review 2+1 roads in the Swedish Transport Administration’s Region East. The report produces and compares the reduction of delay costs after rebuilding a road from 2+1- to 2+2-standard, the report also presents and compares the delay cost with the investment cost for the reconstruction. This study is based on literature studies, analysis of data from the “Traffic Management”, internet-based programs and through the use of Microsoft Excel for calculating delay hours and -costs for selected roads and routes. The result of the report shows whether it is worth investigating in a reconstruction from 2+1- to 2+2-road from delay cost perspective. This is presented through a general comparison per Scandinavian mile of 2+1-road based on roads 50, 55 and 56 in the Swedish Transport Administration’s Region East. The report also contains an analysis of the five most affected accident sites on the E18's 2+1-routes. The analysis of these accident sites showed that all five were between Köping and Västerås in Västmanland county.

Place, publisher, year, edition, pages
2019. , p. 82
Series
TRITA-ABE-MBT ; 19545
Keywords [en]
2+1-road, 2+1-route, 2+2-way, 2+2-route, meeting separated road, meeting-free road, delay hours, delay cost, reconstruction, Swedish Transport Administration, Region East
Keywords [sv]
2+1-väg, 2+1-sträcka, 2+2-väg, 2+2-sträcka, mötesseparerad väg, mötesfri väg, förseningstimmar, förseningskostnad, ombyggnad, ombyggnation, Trafikverket, Region Öst
National Category
Other Civil Engineering
Identifiers
URN: urn:nbn:se:kth:diva-260251OAI: oai:DiVA.org:kth-260251DiVA, id: diva2:1354948
External cooperation
Trafikverket
Educational program
Bachelor of Science in Engineering - Constructional Engineering and Design
Available from: 2019-09-26 Created: 2019-09-26 Last updated: 2022-06-26

Open Access in DiVA

fulltext(3965 kB)303 downloads
File information
File name FULLTEXT01.pdfFile size 3965 kBChecksum SHA-512
12e9d50dc9a18ef5acb6ed0379d80d877495cb0ee95eb2368f1bf6d7dfaf7888490b0332142ce25f7598f49fc3bcf50e15510cd582f69ca997e26ec9c8bc2c4b
Type fulltextMimetype application/pdf

By organisation
Building Technology and Design
Other Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 303 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 392 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf