TIDSÅTGÅNG VID STOMMONTAGE - En jämförelse mellan KL-träelement och platsgjuten betong
Örebro University, School of Science and Technology.
Örebro University, School of Science and Technology.
2019 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
TIME REQUIRED FOR ASSEMBLY OF FRAME  - A comparison between CLT-elements and cast concrete (English)
Abstract [sv]

KL-träelement används som stommaterial i allt fler flerbostadshusprojekt i Sverige, då det fortfarande är en relativt ny metod är det intressant att undersöka den närmare. Vid val av stomme är byggtiden ofta en viktig faktor och därför ligger montagetiden till grund för jämförelsen i studien. Denna rapports syfte är att ge mer information inför valet genom att jämföra en KL-trästomme med en platsgjuten betongstomme utförd med plattbärlag och skalväggar med hänsyn till tidsåtgång av montage. En litteraturundersökning har genomförts för att analysera vilka faktorer som påverkar tidsåtgången vid resning av de två stomalternativen. Planeringsverktyget Powerproject har använts för att ta fram en tidsplanering för vardera stomme. Tidsplaneringarna har sedan jämförts för att se vilket stomalternativ som ger minst tidsåtgång. För att stommarna ska bli så jämförbara som möjligt har gemensamma egenskapskrav ställts på bärighet, brandmotstånd och ljudisolering samt U-värde. När stommen uppfyller dessa krav, betongen torkats till 90 % relativ fuktighet och efterföljande aktiviteter kan påbörjas bedöms stomarbetet klart. Simuleringarna av tidplanerna har gjorts för kvarteret Norrstjärnan i Örebro som har använts som referensobjekt. Tiderna i rapporten är baserade på underlag tillhandahållet av NCC. Utifrån tidsplaneringarna för referensobjektet konstateras att den totala tidsåtgången för en KL-trästomme är 125 arbetsdagar och 169 arbetsdagar för en betongstomme. Det är en skillnad på 44 arbetsdagar vilket ger en procentuell skillnad på ca 35 %.

Abstract [en]

CLT-elements are used as frame material in an increasing number of multi-dwelling buildings projects in Sweden, as it is still a relatively new method, it is interesting to investigate it more closely. In the choice of frame, construction time is often an important factor and therefore the assembly time is the basis for the comparison in the study. The purpose of this report is to provide more information prior to the choice by comparing a CLT-element frame with a cast concrete frame made with lattice girder system and half shell precast walls with regard to the time required for assembly. A literature survey has been carried out to analyze which factors influence the time spent on raising the two frame options. The planning tool Powerproject has been used to develop a time schedule for each frame. The time schedules have then been compared to see which framework alternative gives the least amount of production time. In order for the frames to be as comparable as possible, common property requirements have been set for bearing capacity, fire resistance, sound insulation and U-value. When the framework meets these requirements, the concrete is dried to 90 % relative humidity and subsequent activities can be started, the work with the frame is considered finished. The simulations of the timetables have been made for the project Norrstjärnan in Örebro, which has been used as a reference object. The times in the report are based on data provided by NCC. Based on the time schedules for the reference object, it is stated that the total time spent on a CLT-element frame is 125 working days and 169 working days for a concrete frame. This is a difference of 44 working days, which gives a percentage difference of about 35 %.

Place, publisher, year, edition, pages
2019. , p. 45
Keywords [en]
CLT, CLT-frame, concrete frame, production time, plannin
Keywords [sv]
KL-trä, KL-trästomme, betongstomme, tidsåtgång, planering
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:oru:diva-76609OAI: oai:DiVA.org:oru-76609DiVA, id: diva2:1353068
Subject / course
Construction Engineering
Supervisors
Examiners
Available from: 2019-09-20 Created: 2019-09-20 Last updated: 2019-09-20Bibliographically approved

Open Access in DiVA

fulltext(3327 kB)1082 downloads
File information
File name FULLTEXT01.pdfFile size 3327 kBChecksum SHA-512
3f4c17758f2ffd0ad3de96a90aeaf0631b572ec1a4f3482023cc34b03fe5f64f92eb8331c8374f947c9095f21d18c2b6af723be7e557192089639a34836d2146
Type fulltextMimetype application/pdf

By organisation
School of Science and Technology
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 1086 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 301 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf