Digitala Vetenskapliga Arkivet

Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Uppföljning av arbetssätt för precisare prognoser inom anläggningssektorn
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
2019 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Follow up of practices for more precise forecasts within the establishment section (English)
Abstract [sv]

Ekonomi och prognostisering är en stor utmaning för alla företag och en viktig pusselbit för lönsamheten i byggindustrin. Digitaliseringen har underlättat kontakten mellan entreprenör och projektledning. Med det tryck som digitaliseringen och av andra konkurrerande företag medför är det viktigt att kunna ställa realistiska prognoser med rätta förutsättningar. Detta för att sedan ta vara på utvinna erfarenheter och ha dem i beaktande vid projektering av kommande projekt. Eftersom en väl utförd prognos från varje projekt medför ett underlag till de framtida besluten inom ett företag är det viktigt att hitta och identifiera risker och möjligheter för varje projekt. Bakgrunden för arbetet är behovet att utreda företagets arbetssätt vid prognoshantering. Arbetet utfördes tillsammans med Svevia och mycket av informationen kommer från det företaget. Studien är baserad på intervjuer samt en enkät. De intervjuade personerna hade olika befattningar inom företaget några från företagsledningen och några från produktionen. Brister i dagens arbetssätt synliggjordes och utreddes. Likaså diskuterades frågor kring utbildning, programvaror och resurser. Vid enkäten var respondenterna var anställda på företaget. Resultatet redovisas i form av diagram. Resultaten från enkäten och från intervjuerna analyserades och ledde fram till denna slutsats: brister fanns genom: avsaknad av utbildning, tidsbrist, saknaden av ett enhetligt arbetssätt och kunskapsbrist beträffande programvara. Den viktigaste bristen är saknaden av ett enhetligt arbetssätt, Uppföljning och tillvägagångssätt gällande prognoser borde vara lika för alla anställda.

Abstract [en]

Economy and forecasting are a big challenge for the corporations and an important piece if the puzzle when it comes to profitability in the construction industry. Digitalization of the workplace within the construction industries has made it easier to communicate between the entrepreneur and project management. A big part of the digitalization and the pressure from other companies makes it very important to be able to make realistic forecasts. Also be able to extract the experience from the forecasts and applying it in the future endeavors of the company. Since a well thought out forecast from every project create a basis in which the future decisions will be grounded in, identifying the risks and possibilities of each project and in how they were resolved to minimize losses will be of much importance. This reports background is the need to investigate a uniform approach to forecast management. This thesis was made in collaboration with Svevia and the bulk of the information was derived from their company. The study is based on interviews conducted with employees and a survey. The respondents held different positions within the company where both members of the management were interviewed and from the production. Shortcomings in current method were made visible and investigated. Likewise issues concerning education, software and resources were discussed. The result of the survey was compiled with diagrams where the employees of the company responded to the different questions. Together with the result of the interviews and the survey the analysis and conclusion was formed. The comprehensive flaws can be attributed to the lack of a uniform practice, where the follow up and approaches are the same for all employees.

Place, publisher, year, edition, pages
2019. , p. 100
Series
TRITA-ABE-MBT ; 19511
Keywords [en]
forecasts, forecast management, economies, practice
Keywords [sv]
prognoser, prognoshantering, ekonom, arbetssätt
National Category
Other Civil Engineering
Identifiers
URN: urn:nbn:se:kth:diva-259676OAI: oai:DiVA.org:kth-259676DiVA, id: diva2:1352945
External cooperation
Svevia
Educational program
Bachelor of Science in Engineering - Constructional Engineering and Design
Available from: 2019-09-20 Created: 2019-09-20 Last updated: 2022-06-26

Open Access in DiVA

fulltext(2243 kB)1426 downloads
File information
File name FULLTEXT01.pdfFile size 2243 kBChecksum SHA-512
e786b8ea65dfa740a0d6d98ee45faec1228f8fda81c99212e95c81e2f065dd0c5660dd1da8955ed11f29f18ee4ba36c0dc4e5e3c7a9412446a7db4f27b46f710
Type fulltextMimetype application/pdf

By organisation
Building Technology and Design
Other Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 1437 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 354 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf