Digitala Vetenskapliga Arkivet

Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Solcellers bidragande faktorer i en byggproduktion
2019 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Solar Cells Contributing Factors in a Building Production (English)
Abstract [en]

Purpose: The purpose of this study is to investigate whether solar cells could have supplied to the energy needs of a construction project during its building phase and see which advantages and disadvantages this would have brought the company.

Method: A case study has been carried out on a selected project with help from a selected company. The data collection methods that have been used for the empirical work have been literature research, document analysis, calculations from a solar cell simulation program and interviews.

Findings: The results of the study answer the questions of the study and show how much solar cells could have contributed to the project, relative to the project’s electricity use. The findings also show how the placement of solar cells on the barracks and tool containers could have been carried out in order to retrieve as much energy from the sun as possible.

Implications: The conclusion of this study is that the solar cells require a considerable amount of space, and therefore the case study project could not have used solar cells only to cover the project’s energy needs. Solar cells require maintenance and are a great cost to the companies involved, but can also promote the company’s reputation and contribute to a more sustainable society.

Limitations: The study has been limited to one construction project of a tennis arena located in the Stockholm region, which was built by a construction company between August 2016 and February 2018. The study only takes the electricity usage during the production phase into account and the aim were to see if electricity from solar cells in the construction area could have contributed to the electricity needs during this period. The focus of the report is not costs, use of batteries, or regulations concerning the project, but these aspects are briefly covered.

Keywords: Solar cells, solar electricity, building production, renewable energy, energy production.

Place, publisher, year, edition, pages
2019.
Keywords [sv]
Solcell, solel, byggproduktion, förnyelsebar energi, energiproduktion
National Category
Construction Management
Identifiers
URN: urn:nbn:se:hj:diva-45825ISRN: JU-JTH-BTA-1-20190304OAI: oai:DiVA.org:hj-45825DiVA, id: diva2:1348907
External cooperation
Serneke AB
Supervisors
Examiners
Available from: 2019-09-18 Created: 2019-09-05 Last updated: 2019-09-18Bibliographically approved

Open Access in DiVA

fulltext(2381 kB)390 downloads
File information
File name FULLTEXT01.pdfFile size 2381 kBChecksum SHA-512
f8b8091467856cfad6cf46a82bbbaef121d5ab896c26ca9e765f1b876eed1736389352be3434e51473f73576e25da92198b14f4e3118a387e184731b8d5427f6
Type fulltextMimetype application/pdf

Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 390 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 367 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf