Digitala Vetenskapliga Arkivet

Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Processtyrning av IVL Svenska Miljöinstitutet AB:sprocesser
KTH, School of Industrial Engineering and Management (ITM), Sustainable production development.
KTH, School of Industrial Engineering and Management (ITM), Sustainable production development.
2019 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Process control of IVL Swedish Environmental Institute’s processes (English)
Abstract [sv]

Processer utgör en verksamhets förmåga att producera, vare sig det gäller produkter eller tjänster. För att IVL Svenska Miljöinstitutet AB ska kunna optimera verksamheten eftersträvas att processtyrning implementeras i stället för linjestyrning. Därför har detta arbete haft som mål att undersöka mätetal och styrformer som är lämpliga att implementera inom processen för projektprocessen ur ett kvalitets-, tids- och kostnadsperspektiv.

Primärdata för denna rapport tillhandahölls genom intervjuer med grupp-/enhetschefer samt medlemmar i ledningen medan sekundärdata baserades på litteraturstudier. För intervjuer beaktades tillförlitlighet, validering och reliabilitet medan litteraturstudier har beaktat publiceringsdatum, relevans och ämnesområden.

Projektprocessen hos IVL Svenska Miljöinstitutet AB består av tre huvudprocesser: “Säljprocessen”, “Genomföra och leverera” samt “Avslutning och utvärdering”. Resultaten av primärdata visar att samtliga mätetal och styrning sker på övergripande nivå, men för processtyrning så behövs mätetal och styrformer nedbrutet på delprocessnivå.

Det är möjligt att uppnå processtyrning på delprocesnivå med hjälp av CRM-Systemet Salesforce som är nyligen implementerat i Säljprocessen och Avslutning och utvärderings-processen. Det upptäcktes även att Genomförande och leverans-processen saknade ett en tydigt projekthanteringssystem. Ur ett kvalitets-, tids- och kostnadsperspektiv tillför ett en tydigt projekthanteringssystem ökad projekteffektivitet och dataunderlag för mätning och förståelse för processerna. Sammanlagt rekommenderades 17 mätetal och 2 styrformer vilka agerar som underlag för ökad kundförståelse, bidrar till långsiktig förbättring av säljprocessen samt agerar som verktyg för beslutsunderlag.

Slutgiltiga rekommendationer för vidare studier är att initiera en förstudie för ett en tydigt projekthanteringssystem. Vidare är frekvens en frågeställning som bör behandlas internt, där rekommendation görs att IVL Svenska Miljöinstitutet AB har målvärdet att mäta och styra senast veckovis.

Abstract [en]

Processes make up the foundation for a company’s capability of producing, whether it is physical products or services. For IVL Swedish Environmental Institute AB to be able to optimize itself internally, process control needs to be implemented instead of traditional line control. Therefore, this project had the goal to research KPIs and control forms that are applicable within the processes from aquality-, time- and cost perspective.

Primary data for this report was collected using interviews with Group Managers and members of the Management, while secondary data was collected using literature studies. For the interviews, reliability and validation were considered. Literature studies have taken publication dates-, relevance and subjectareas into account upon studying.

The project processes at IVL Swedish Environmental Institute AB consists of three main processes: ”Sales Process”, ”Accomplishing and Delivering” and ”Concluding and Evaluating”. Results from the primary data show that all KPIs and forms of control occur on a general level. However, for process control there is a need for KPIs and forms of control on a subprocess-level.

It is possible to achieve process control on a subprocess-level with assistance from the newly implemented CRM-System Salesforce, within the Sales-process and Concluding and Evaluating process. It was also discovered that the Accomplishing and Delivering process is lacking an unambiguous Project Management System. From a quality-, time- and cost perspective, such a system delivers increased internal project efficiency and a basis for data-collection for KPIs and understanding for the processes. In-total, 17 KPIs and 2 forms of control were recommended, which act as a foundation for improved customer relations, continuous improvement and as tools within decision models.

Final recommendations for further studies are to initialize a pilot study for an unambiguous Project Management System. Furthermore, the topic of frequency of measurement is a matter that needs to bediscussed internally, where a recommendation is made for IVL Swedish Environmental Institute AB toset a target value to measure and control on a weekly basis.

Place, publisher, year, edition, pages
2019.
Series
TRITA-ITM-EX ; 2019:454
Keywords [en]
Process control, Industrial Engineering and Management, Business Control, KPI, Metrics, Salesforce
Keywords [sv]
Processtyrning, Industriell Ekonomi och Organisation, Verksamhetsstyrning, KPI, Mätetal, Styrformer, Salesforce
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:kth:diva-255839OAI: oai:DiVA.org:kth-255839DiVA, id: diva2:1342359
Supervisors
Examiners
Available from: 2019-08-13 Created: 2019-08-13 Last updated: 2022-06-26

Open Access in DiVA

fulltext(915 kB)776 downloads
File information
File name FULLTEXT01.pdfFile size 915 kBChecksum SHA-512
849abb24162fc2ed197e6bdb11a1a556278c59f481de55062d30cd1763796820eaac2398afe52c88eb0d1c63ec653860eac1c5be1b6e53d6942c31b661cf2d35
Type fulltextMimetype application/pdf

By organisation
Sustainable production development
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 777 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 867 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf