Digitala Vetenskapliga Arkivet

Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
FÖRBÄTTRING OCH RATIONALISERING AV LOGISTIK OCH MATERIELLEVERANS: RÖRANDE OMBYGGNATION OCH NYBYGGNATION
Mälardalen University, School of Business, Society and Engineering.
Mälardalen University, School of Business, Society and Engineering.
2019 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

Logistics and material delivery are important aspects in a building project where it has direct impact on the workflow and production schedule. Research on this subject has studied where one sees great opportunities for improvement. The research says that the delivery precision, construction site lay out plan and the productivity can be managed more efficiently and as a result canreduce construction costs up to 25-30%. This degree project examines and compares two building projects in Eskilstuna, one conversion (Högvakten 1) and a new construction (Kv. näven). The basis for the improvement work is of Toyota's production philosophy that has been studied and also known asLean production where great importance is put on streamlining production by removing unnecessary work that does not increase added value of the end product. Examination of the construction site plan for each project and interviews was carried out by internal/external staff to be able to create a better understanding of the different workplaces. To study productivity at the workplaces fieldstudies were done through taking time of different work tasks that were divided into different categories. This was done on two separate days for each workplace. The first occasion was when a material delivery occurred, and the second day was a day without material delivery. 

Finally, a questionnaire was designed with different solutions that were developed with the help of theliterature study, the interviews and sitevisits. The survey shows what the different construction sites think about the solutions where the result is described with percentage and opinones.

Place, publisher, year, edition, pages
2019. , p. 68
Keywords [sv]
Logistik, materielleverans, arbetsflödet, APD-planen, ombyggnation, nybyggnation, Lean produktion, Toyotas produktions filosofi.
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:mdh:diva-44922OAI: oai:DiVA.org:mdh-44922DiVA, id: diva2:1338225
Subject / course
Building Engineering
Presentation
2019-06-03, Mälardaöens hogskla, Västerås, 22:31 (Swedish)
Supervisors
Examiners
Available from: 2019-08-13 Created: 2019-07-20 Last updated: 2019-08-13Bibliographically approved

Open Access in DiVA

fulltext(3722 kB)172 downloads
File information
File name FULLTEXT01.pdfFile size 3722 kBChecksum SHA-512
2cd1132e0aeab657315adbc8531211567721bfa9daaa4ad1a184386bc463ef4553418501200cee461386152608db72014d2e231459e86931768bf7f670e487d7
Type fulltextMimetype application/pdf

By organisation
School of Business, Society and Engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 172 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 324 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf