Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Investeringsbeslut i komplexa projekt: Fallstudie - Överdäckning av centralstationsområdet
KTH, School of Architecture and the Built Environment (ABE), Real Estate and Construction Management.
KTH, School of Architecture and the Built Environment (ABE), Real Estate and Construction Management.
2019 (Swedish)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesisAlternative title
Investment Decisions in Complex Projects (English)
Abstract [sv]

Vid investeringar i komplexa projekt finns det många aspekter att ta hänsyn till och det finns många metoder för att kunna utvärdera dessa investeringar. Komplexa projekt som en överdäckning där nya ytor tillskapas och befintliga trafikleder byggs över genererar fler nyttor än bara ekonomiska. Vid investeringsbeslut är det därav av stor vikt att kunna värdera investeringen med hänsyn till de aspekter som är av intresse.Samhällsekonomisk analys är en metod som ofta förekommer vid investeringsbeslut där fler än bara ekonomiska aspekter ska inkluderas. Metoden är välkänd och förekommer både i den akademiska sfären men används även praktiskt bland företag. En annan metod, option games är en nyare metod där förankring finns i teorin men inte har tillämpats i lika hög grad i praktiken.Syftet med detta arbete är att jämföra två metoder, samhällsekonomisk analys och option games. Detta för att bedöma vilken av metoderna som lämpar sig bäst vid investeringsbeslut i komplexa projekt. De två metoderna kommer att utvärderas med hjälp av tre valda bedömningskriterier. Metoderna utvärderas på hur väl de tar hänsyn till antaganden och indata, deras applicerbarhet i den aktuella fallstudien och slutligen hur omfattande metoden är. Arbetet är genomfört som en fallstudie och har applicerats på överdäckningen av Stockholms centralstation.Resultatet visar att samhällsekonomisk analys överlag är bättre än option games som metod för att generera beslutsunderlag för investeringar vid komplexa projekt. Dock finns det aspekter som option games tar hänsyn till men som saknas i den samhällsekonomiska analysen. Känslighetsanalysen pekar ut kalkylräntan som den viktigaste parameter i de båda metoderna.

Abstract [en]

There are many aspects to consider when investing in complex projects and there exist several methods to evaluate those investments. Complex projects such as a decking over existing thoroughfares engender new areas that generate more utility than just economic. Therefore it is of great importance in case of investment decisions to evaluate the investment with regards to the aspects of interest.Cost Benefit Analysis (CBA) is a method used in contexts where more than just the economic aspects are included in the investment decision. The method is well-known and appears in both the academic field and practical at companies. A different method, Option Games is newer and so far mainly applied theoretical and not used in daily practice yet.The aim with this paper is to compare the two methods, Cost Benefit Analysis and Option Games. The goal is to assess which of the two methods best includes the aspects of interest when considering investment decisions for complex projects. The methods will be evaluated based on three selected criteria. Firstly, assumptions and inputs of the two methods. Secondly, their applicability in the current case study and finally the scope of the methods. The paper is conducted as a case study applied on the planned over decking of Stockholm Central station.The result indicates Cost Benefit Analysis to be the preferable method compared to Option Games. Cost Benefit Analysis generates a better foundation when investing in complex projects. Nevertheless, Option Games does regard some aspects that are not considered in the Cost Benefit Analysis method. The most important parameter for both methods is the discount rate in relation to the implemented sensitivity analysis.

Place, publisher, year, edition, pages
2019. , p. 63
Series
TRITA-ABE-MBT ; 19182
Keywords [en]
Cost benefit analysis, Option games, Investment decision, Decking over
Keywords [sv]
Samhällsekonomisk analys, option games, investeringsbeslut, överdäckning
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:kth:diva-254738OAI: oai:DiVA.org:kth-254738DiVA, id: diva2:1335031
Supervisors
Examiners
Available from: 2019-08-13 Created: 2019-07-03 Last updated: 2019-09-25Bibliographically approved

Open Access in DiVA

fulltext(2539 kB)13 downloads
File information
File name FULLTEXT01.pdfFile size 2539 kBChecksum SHA-512
bb1c70024272413a039d537d4ae6b40f2fa52a972aeb699c649af6b3846872f12f14787ac83e56cd28aa02a3b856e0dae9818ad5717b7e7047c547d003681ad3
Type fulltextMimetype application/pdf

By organisation
Real Estate and Construction Management
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 13 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 24 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf