Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Enhetstider
Örebro University, School of Science and Technology.
Örebro University, School of Science and Technology.
2019 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Unit Times (English)
Abstract [sv]

OBK Sverige AB är en totalentreprenör från Örebro som bildades 2011. De har idag ca 65 anställda. De har inte kunnat arbeta in så mycket tid som de förväntat sig vid projektet Brf Vingen. Olika moment för projektet kommer att granskas och jämföras med ett av OBKs andra projekt, Kv. Sjukhuset. Enhetstiderna för momenten kommer jämföras med den gamla och den nya listan för enhetstider. Syftet med denna uppsats är att få svar på frågorna nedan.  • Hur stämmer vissa enhetstider som finns i den gamla listan i jämförelse med verkligheten? • Vad kan vara anledningen till att tiderna i vissa fall inte går att hålla? • Hur kommer den nya listan stämma överens med verkligheten? Enhetstiderna för momenten kommer jämföras med Nybyggnadslista 1999 och inte Ombyggnadslista 1999, då båda projekten är nybyggnationer. Dessa listor har getts ut av Byggnads, som är ett fackförbund, tillsammans med Sveriges Byggindustrier.  Litteraturstudier samt intervjuer har utförts för att ta fram information om vad enhetstider är. Intervjuer har gjorts för att få fram enhetstider och mängder för de granskade momenten. För att beräkna hur lång tid det tar att bygga en enhet av ett moment används enhetstider. Målning, gjutning och gipsning är exempel på olika moment och enheterna kan vara kvadratmeter, meter, styck osv. Enhetstiden varierar för olika moment och den multipliceras sedan med den totala mängden för momentet. Då får man fram hur lång tid det är beräknat att ett moment ska ta.  Momenten som granskats för båda projekten är betongstomme, taktäckning och gipsning av innerväggar. För projektet Brf Vingen har också fasadpartier av trä granskats. Resultatet i uppsatsen är att förutsättningen för inarbetning, när man arbetar efter nya listan, vid betongstommen för Brf Vingen ökar medan den för Kv. Sjukhuset minskar. Gipsning av innerväggar ökar, taktäckning minskar och fasadpartierna av trä minskar.  Beroende på olika faktorer i de projekt som granskats så stämmer enhetstiderna i den gamla listan olika bra med verkligheten. Anledningen till att vissa tider inte går att hålla är till exempel brant taklutning, små och trånga utrymmen samt byggnadens utformning. Den nya listan stämmer bättre överens med verkligheten för de granskade momenten. 

Abstract [en]

OBK Sverige AB is a contractor company from Örebro that was established 2011. Today they have about 65 employees. They have not been able to save as much time as they where hoping for at one of their projects called Brf Vingen. We are going to view different stages of this project and compare to another of their projects called Kv. Sjukhuset. The unit times for the different stages will be compared to the old and the new list of unit times. The purpose with this essay is to answer these following questions. • How does some of the unit times from the old list come out compared to reality? • What can be the reason that the unit times in some cases can´t be kept? • How is the new list going to come out compared to reality? The unit times for the stages will be compared to Nybyggnadslistan 1999 an not to Ombyggnadslistan 1999 because the projects which are going to be viewed are constructions and not reconstructions. These lists have been published by Byggnads, which is trade union, with Sveriges Byggindustrier. Literature studies and interviews have been used to get the information about what unit times are. Interviews have also been used to get the unit times and amounts we needed for the viewed stages.  Unit times are being used to calculate how much time it takes to build one unit of a stage. Painting, foundry work and plastering is some examples of different stages and the units can be square meter, meter, piece etc. The unit time is different for different kinds of stages. This unit time is multiplied with the total amount of the stages.  The stages which has been selected to be viewed from both of the projects are the concrete frame, the roofing and the plastering of the interior walls. The wood panel at Brf Vingen has also been selected to be viewed. The result in this essay is that the time that has been saved, using the new list, for the concrete frame at Brf Vingen has increased and at Kv. Sjukhuset it has decreased. For the roofing it has decreased, for the plastering of the interior walls it has increased and for the wood panel it has de creased.  Depending on various factors in the viewed projects the unit times in the old list comes out differently well compared to reality. The reason that the unit times in some cases can´t be kept is for example that the roof slope is too steep, small and narrow spaces and also the construction design. The new list comes out better for the viewed stages compared to reality.

Place, publisher, year, edition, pages
2019. , p. 27
Keywords [en]
Unit time, saved time, follow-up, distibuted time, worked time, case study
Keywords [sv]
Enhetstid, inarbetning, uppföljning, Nybyggnadslistan 1999, Ny- och ombyggnadslista 2018, fördelad tid, fallstudier
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:oru:diva-74908OAI: oai:DiVA.org:oru-74908DiVA, id: diva2:1333381
Subject / course
Construction Engineering
Supervisors
Examiners
Available from: 2019-07-01 Created: 2019-07-01 Last updated: 2019-07-01Bibliographically approved

Open Access in DiVA

fulltext(1344 kB)210 downloads
File information
File name FULLTEXT01.pdfFile size 1344 kBChecksum SHA-512
65d33b16d056a1c3b9974b58f9f84c6672dd09cd97eb447f12821da59e78def6415f8e6835fc290ac6599af2c9420f5f433d397845a877761954faeca693f97c
Type fulltextMimetype application/pdf

By organisation
School of Science and Technology
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 210 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 320 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf