Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Lufttäta klimatskal i prefabricerade betongstommar och pelar- balksystem med lätta utfackningsväggar
Umeå University, Faculty of Science and Technology, Department of Applied Physics and Electronics.
2018 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Airtight climate shell in precast concrete buildings and post- beam structural systems with curtain walls (English)
Abstract [sv]

Sveriges periodvis mycket kalla klimat kräver att en byggnad är utrustad med ett tillräckligt värmeisolerande klimatskal för att vi ska kunna hålla energianvändningen nere, dvs hushålla med den tillförda energin. Enligt Energiprestandadirektivet ska alla nya byggnader som byggs inom EU efter år 2020 vara nära- nollenergibyggnader. Även om begreppet ännu inte definierats till fullo så kan man sammanfattningsvis säga att det är Boverket som preciserar kraven på energihushållning och värmeisolering. Det ställs dock inga specifika krav på mätbara värden gällande lufttätheten. Det är numera upp till byggherren att ställa krav och dessa formuleras i programarbetet.

Vid nyproduktion ägnas det inre lufttäta skiktet mycket tid och uppmärksamhet. Ofta finns det standardlösningar men vissa detaljer är mer arbetskrävande att lösa och en av dessa är bjälklagsanslutningar. Samförstånd verkar dock råda vad gäller befintlig forskning på klimatskal med tunga ytterväggar så som sandwichelement. Denna typ av konstruktion har mycket goda förutsättningar att ge en beständigt låg transmissionsförlust samt god lufttäthet i det långa loppet. Historiskt sett har fogarna varit den svaga punkten.

Syftet med denna studie är att undersöka förutsättningarna för en standardlösning i anslutningen mellan stål och HD/F mot lätt utfackningsvägg med målsättning att denna typ av konstruktionsdetalj ska bli tätare. En undersökning kommer även göras för att få bättre kännedom om problem med lufttäthet och diffusionstäthet i klimatskalet, dels i prefabricerade betongstommar samt dels i pelar-balksystem med lätt utfackningsvägg, för att få en bättre förståelse för om detta kan härledas till olika skeden i byggprocessen. Erfarenheter från olika yrkesgrupper samlades in och utvärderades mot den befintliga teorin. Totalt 26 företag intervjuades antingen ansikte mot ansikte eller via e-post och telefon.

Studien visar att det än idag uppstår problem i fogarna mellan betongelement. De intervjuade vittnar om fogar som spricker, är bristfälligt utförda, är svåra att komma åt samt att foggjutningen misslyckas eller glöms bort. Så även om förutsättningarna finns för att klimatskal med tunga ytterväggar ska kunna hålla en beständigt låg transmissionsförlust och god lufttäthet så finns det fog för vidare studier inom detta område.

Bland de förslag som givits av de intervjuade till en standardlösning framstår ett förslag mer intressant än de andra och det är att förse stålbalkarnas flänsar med bitumenband innan betongbjälklagen sätts på plats. Hur väl detta förslag fungerar i praktiken återstår dock ännu att se.

Det finns gott om idéer från de intervjuade på hur plastfolien bäst bör monteras för att uppnå maximal lufttäthet men det måste i grund och botten finnas en balans mellan hur otillräcklig informationen får vara på en ritning och hur mycket projektörer och konstruktörer bör kunna förvänta sig att hantverkare ska lösa på plats. 

Abstract [en]

Sweden's periodically very cold climate requires a building to be equipped with a sufficiently heat-insulating climate scale so that we can keep energy consumption down, ie maintain the energy supplied. According to the Energy Performance Directive, all new buildings built in the EU after 2020 must be close to zero energy buildings. Although the term has not yet been fully defined, it can be summarized that it is the Boverket, which specifies the requirements for energy conservation and thermal insulation. However, there are no specific requirements for measurable values regarding air density. It is now up to the builder to make demands and these are formulated in the program work. At new production, the inner airtight layer is devoted to a lot of time and attention. There are often standard solutions, but some details are more labor-intensive to solve and one of these is floor joints. However, consensus appears to exist regarding existing research on climate scale with heavy exterior walls such as sandwich elements. This type of construction has very good conditions for providing a sustained low transmission loss and good air tightness in the long run. Historically, the joints have been the weak point. The purpose of this study is to investigate the prerequisites for a standard solution in the steel / HD / F meeting against curtain walls with the aim of tightening this type of structural component. An investigation will also be made to get a better understanding of air tightness and diffusion density problems in the climate shell, partly in precast concrete buildings, as well as in post- beam structural systems with light curtain walls, to gain a better understanding of whether this can be derived from different stages of the construction process. Experiences from different professions were collected and evaluated against the existing theory. A total of 26 companies were interviewed either face to face or via email and telephone. The study shows that problems still arise in the joints between concrete elements. The interviewees testify to joints that crack, are defective, are difficult to access, and that the casting fails or is forgotten. So, even though the conditions are high for climate scale with heavy exterior walls to maintain a sustained low transmission loss and good air tightness, there is scope for further studies in this area. Among the suggestions given by those interviewed to a standard solution, one proposal appears more interesting than the others, and it is to supply the steel beams flanges with bitumen bands before the concrete bellows are put into place. However, how well this proposal works in practice remains to be seen. There are some very good ideas from the interviewees on how to best fit the plastic film to achieve maximum air tightness but there must basically be a balance between how insufficient information may be on a drawing and how much projectors and designers should expect craftsmen to solve on site.

Place, publisher, year, edition, pages
2018. , p. 69
National Category
Engineering and Technology Building Technologies
Identifiers
URN: urn:nbn:se:umu:diva-159674OAI: oai:DiVA.org:umu-159674DiVA, id: diva2:1319766
External cooperation
Skanska Sverige. Hus Norr
Subject / course
Byggteknik
Educational program
Bachelor of Science Programme in Civil Engineering
Supervisors
Examiners
Available from: 2019-06-03 Created: 2019-06-03 Last updated: 2019-06-03Bibliographically approved

Open Access in DiVA

fulltext(1128 kB)29 downloads
File information
File name FULLTEXT01.pdfFile size 1128 kBChecksum SHA-512
9efbe5336ff792a016d4b1502cabe32a197a326a0f6eb71143165309d86c04bdbc58acbee6f449f7a3c9bbd98fd20db2dd30ee18130adf5e0d38e63d17b4bf4d
Type fulltextMimetype application/pdf

By organisation
Department of Applied Physics and Electronics
Engineering and TechnologyBuilding Technologies

Search outside of DiVA

GoogleGoogle Scholar
Total: 29 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 14 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf