Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Detaljerad 3D: Mängder och detaljer från modellen
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Applied Mechanics, Byggteknik.
2019 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Detailed 3D (English)
Abstract [sv]

Digitalisering i dagens byggindustri spelar större roll än tidigare. Användning av pappersritningar minskar och tillgång till 3D/BIM modell i VR eller en surfplatta är mer vanligt, men för att detta ska fungera krävs utveckling inom området. Arbetets första del försöker underöka skillnaden mellan Autodesk Revit parametrar length och cut length av stålbalkar för längdavtagning så att processen kan förenklas och göras till en mer automatisk. Andra delen fokuserar på implementering av konstruktionsdetaljer i 3D modeller.

Metod för arbetet består av en litteraturstudie för insamling av information och två datorundersökningar. Den första datorundersökningen för gransk-ningen av skillnaden mellan längdparametrarna för enstaka balkar och olika kombinationer med byggelement. Den andra datorundersökningen består av två olika sätt att tillverka förband, Revit 2018 som erbjuder färdiga lösningar och Revit 2019 där allt byggs från olika komponenter.

Resultatet visar att parametern length oftast inte har någon betydelse för den verkliga längden och cut length är den parameter som visar korrekta längden. Lösning med förband i 3D modeller kan hittas i Revit 2019 men kräver förbättringar för kompletta resultat. Revit 2018 kan användas i vissa specialfall, men inte för komplexa modeller.

Abstract [en]

Digitalization in the construction industry is taking huge stepstowards becoming less dependent on paper drawings and insteadincreasing usage of 3D/BIM models throughout the whole constructionprocess. This thesis attempts to gain a better understanding forAutodesk Revit parameters length and cut length of steel beams, toincrease accuracy and level of automatization for quantity takeoffs.The second part of thesis contains implementation of steelconnections in 3D models since the creation usually takes place in 2Dprograms.

Method contains information search in books, other theses, websitesand two computer studies. The first one for length measurementpurpose to understand difference between length parameters of singlebeams and interactions between various construction elements. Thesecond part contains test of steel connections tool in Revit 2018 onthe simple steel construction and toolbar steel in Revit 2019 forconstructing a couple parts from 2D drawings.

The results make it clear that parameter length usually has nothingin common with the actual length of the beam and cut length is theparameter one should be consider. Solutions for steel connections in3D models might be found in Revit 2019, although some improvementsare necessary. Revit 2018 might be useful in some minor cases, butnothing too complicated.

Place, publisher, year, edition, pages
2019. , p. 46
Keywords [sv]
3D, balklängd, BIM, cut length, förband, length, mängdavtagning, Revit
National Category
Environmental Analysis and Construction Information Technology
Identifiers
URN: urn:nbn:se:uu:diva-383638ISRN: UTH-INGUTB-EX-B-2018/30-SEOAI: oai:DiVA.org:uu-383638DiVA, id: diva2:1316768
External cooperation
Knut Jönssons Ingenjörsbyrå Uppsala
Educational program
Bachelor Programme in Construction Engineering
Supervisors
Examiners
Available from: 2019-05-23 Created: 2019-05-21 Last updated: 2019-05-23Bibliographically approved

Open Access in DiVA

Detaljerad 3D(3900 kB)20 downloads
File information
File name FULLTEXT01.pdfFile size 3900 kBChecksum SHA-512
695fbdee2b022130b8d20b30a2de898f11a4c78a8c24e24133d61c70ad116a01e60a303d1bc9f48616cc57c48a35ecaea44b68191e70ab713558371aed09ff62
Type fulltextMimetype application/pdf

By organisation
Byggteknik
Environmental Analysis and Construction Information Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 20 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 128 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf