Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Svensk Byggindustri och Critical Success Factors: En lokal diskussion kring kritiska moment vid implementering av BIM
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Applied Mechanics, Byggteknik.
2019 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Swedish Construction Industry and Critical Success Factors : A local discussion surrounding criticial moments during implementation of BIM (English)
Abstract [sv]

BIM (Building Information Modelling) är idag ett exponentiellt ökande område inom byggindustrin, som inte visar några tecken att sakta ner. I takt med att BIM som koncept och process används i större omfattning både internationellt och nationellt, dyker problem dock oundvikligen upp vid dess implementering. De faktorer som orsakar dessa problem har i detta examensarbete givits termen CSF, ett begrepp som hittills ej använts inom svensk byggindustri. CSF står för Critical Success Factors, vilket innefattar det som i svenska arbeten annars till exempel kallats ”kritiska faktorer”, ”hindrande faktorer”, ”bromsande faktorer” etc.

Syftet med detta arbete är därmed att utforska både begreppet CSF och dessa faktorer, samt deras betydelse och relevans. Utifrån tidigare studier, främst utländska, identifierades och introducerades termen CSF samt 14 sådana punkter, vilka gavs en utförligare beskrivning. För att ge dessa 14 punkter en lokal anknytning, intervjuades fem personer i svensk byggindustri med olika erfarenheter av BIM. Det framträdde då klara likheter mellan tidigare diskussion kring de identifierade punkterna och intervjuresultaten.

De centrala tankar som kontinuerligt återkom under arbetets gång var värdet av gemensam och delad förståelse, samt vikten av att ta vara på redan etablerad kunskap inom byggindustrin. Det finns i branschen en ofta påtalad klyfta mellan olika generationer, vilket enligt detta arbete ses som det tydligaste exemplet både på en bristande förståelse och ett dåligt utnyttjande av tidigare kunskaper. Vid ett ineffektivt möte mellan olika erfarenheter och kunskaper så leder detta till friktion istället för utveckling, med bortslösade resurser och kunskaper som resultat. Ett stort fokus med detta arbete blev därför att betona den mänskliga aspekten av BIM-implementering snarare än de tekniska delarna.

Slutligen konstaterar detta examensarbete att de 14 utvalda punkterna samt användandet av deras övergripande term CSF har ett mervärde både för framtida studier och framtidens implementeringar av BIM, vilket därmed även uppfyller rapporten syfte.

Abstract [en]

BIM (Building Information Modeling) is an exponentially growing field within the construction industry, with no signs of slowing down. However, as the process continues to spread on both an international and national scale, issues with implementation inevitably arise due to many different factors, in this work identified as CSF (Critical Success Factors).

The purpose of this work is therefore to examine these factors, as well as the term CSF itself, with regards to meaning and relevance. Based on previous studies the term CSF, as well as 14 factors, were established. To correlate these internationally described factors to the Swedish market, five interviews featuring people with experience of BIM in Sweden were conducted, after which similarities and patterns could be recognized.

The core concepts continually established throughout the work was the value of mutual and shared understanding, as well as the importance of utilizing previously established knowledge within the construction industry. The report concludes that the identified factors as well as the term CSF are both valid and beneficial for future discussions and implementations of BIM

Place, publisher, year, edition, pages
2019. , p. 96
Keywords [en]
Critical Success Factors, CSF, Building Information Model, BIM, Success Criteria
Keywords [sv]
Critical Success Factors, CSF, Building Information Model, BIM, Success Criteria, Kritiska Faktorer
National Category
Construction Management
Identifiers
URN: urn:nbn:se:uu:diva-383266ISRN: UTH-INGUTB-EX-B-2018/31-SEOAI: oai:DiVA.org:uu-383266DiVA, id: diva2:1315145
Educational program
Bachelor Programme in Construction Engineering
Presentation
2018-11-27, Fakultetsrummet (rum 1203), Lägerhyddsvägen 1, 752 37, Uppsala, 10:15 (Swedish)
Supervisors
Examiners
Available from: 2019-05-13 Created: 2019-05-12 Last updated: 2019-05-13Bibliographically approved

Open Access in DiVA

fulltext(718 kB)39 downloads
File information
File name FULLTEXT01.pdfFile size 718 kBChecksum SHA-512
62d00bd3302df6c711245e0b0cbce0a8b47cd29ea3ce66743eeb1e9135f1958e79cf5cd800108407cffbd2cc11bc34b7a995fbb7e4122144153ee90b3550503e
Type fulltextMimetype application/pdf

By organisation
Byggteknik
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 39 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 197 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf