Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Funktion hos markbaserade reningsanläggningari fält, komplettering
RISE - Research Institutes of Sweden, Bioscience and Materials, Agrifood and Bioscience.
RISE - Research Institutes of Sweden, Bioscience and Materials, Agrifood and Bioscience.
2019 (Swedish)Report (Other academic)
Abstract [sv]

Projektet ”Funktion hos markbaserade reningsanläggningar i fält, komplettering” har haft som syfte att komplettera projektet ”Funktion hos markbaserade renings­anläggningar i fält” som gick ut på att utvärdera funktionen hos markbaserade renings­anläggningar – infiltrationer och markbäddar med och utan biomoduler och/eller fosforavlastning. Med hjälp av fortsättningsprojektet ökade antalet inventerade anläggningar från 101 till 157.

Liksom tidigare projekt ska detta projekt ge en ögonblicksbild över hur markbäddar och infiltrationer fungerar i fält – mot bakgrund av att erfarenheter från flera håll har pekat på att det förekommer funktionsproblem som igensättningar och nedsatt rening hos denna anläggningstyp. Syftet är att komplettera projektet för att göra underlaget mer statistiskt säkert (större antal mätningar) och mer representativt med avseende på de olika förutsättningar som kan finnas i Sverige.

Resultatet visar att 8 % av anläggningarna hade mycket höga nivåer av vatten (≥ 11 cm) och 9 % hade mycket höga nivåer av slam (≥ 5 cm) i spridarrören. Det finns indikationer på samband mellan mycket höga nivåer av vatten i spridarrör och funktionsfel  i form av höga vattennivåer i andra delar av anläggningen, eller funktionsfel som framkommit av kommentarer. Även för mycket höga nivåer av slam finns vissa indikationer på att det är kopplat till olika funktionsfel, dock är dessa samband inte lika tydliga. Något höga nivåer av slam (2–5 cm) och vatten (3–11 cm) verkar inte ha lika starka samband med funktionsfel.

Studien indikerar att större vattenbelastande installationer, t.ex. badkar större än 300 liter eller vattenreningsfilter som backspolar stora mängder vatten, inte bör släppas ut till avloppsanläggningen samt att det är viktigt att anläggningen byggs enligt den storlek som är angiven i tillståndet. Den statistiska analysen som utförts i studien tyder också på att anläggningens ålder kan vara en ”naturlig” orsak till mycket höga vattennivåer.

Enligt SGU:s databas låg grundvattennivåerna under tiden för inspektionerna mycket under det normala eller under det normala (SGU 2018). Utifrån givna kriterier i projektet bedöms andelen anläggningar som inte klarar kraven på en meter till grundvattnet vara 7 %.  För 53 % är det dock osäkert om kraven uppfylls eftersom det saknas kontroll­punkter som bedöms som tillförlitliga eller så ligger kontrollpunkten på för långt avstånd för att bedömas som relevant. Utan en sådan kontrollpunkt är det svårt att följa upp om avståndet till grundvattennivån ligger inom riktlinjen på en meter.

Det är viktigt att komma ihåg att de inspektioner som utförts endast ger en ögonblicks­bild av anläggningen och inte anläggningens funktion över tid. Att följa några anläggningar under en längre period skulle ge en bättre bild av funktionen över tid och en bättre uppfattning om hur slam- och vattennivåer kan variera i olika delar och  vid olika årstider. Det saknas även undersökningar om hur t.ex. olika nivåer av slam och vatten i spridarrör påverkar reningseffekten i anläggningen samt effekten av åtgärder som t.ex. spolning eller ökad ventilation. Detta behöver studeras framöver för att öka kunskapen och ge vägledning när det gäller  vilka åtgärder som kan vidtas vid olika typer av funktionsproblem.

Abstract [en]

This project, Function in small on-site soil and infiltration beds for wastewater treatment in field – competition, investigated the status of small on-site soil treatment systems (STS) for wastewater in field. The project is an extension of a former project, “Function in small on-site soil and infiltration beds for wastewater treatment in field” where 101 were inspected. Together with 56 inspections from this project there were a total of 157 filed inspections.

The purpose of the study was to find out if there were any common problems in STS and to suggest if they could be prevented. This after that several projects pointed out the occurrence of functional problems, such as clogging and decreasing purification in STS. This study is a supplement to the prewires project to make the quantity more statistically safe (larger number of measurements) and more representative regarding the different conditions that may exist in Sweden.

The result shows that 8% of the STS had very high levels of water (≥ 11 cm) and 9% had very high levels of sludge (≥ 5 cm) in the distribution pipes. There are indications of correlations between very high levels of water in the distribution pipe and high water levels in other parts of the plant, which suggest that the plant is not working as it should. High levels of water can also be connected to functional faults that have arisen from the comments observed in the field and noted in field protocols.  For very high levels of sludge, there are some indications of relationships of various malfunctions, however, these connections are not as clear. Slightly high levels of sludge (2–5 cm) and water (3–11 cm) do not seem to have as strong connection with malfunction.

The study also indicates that greater water-loading installation, e.g. baths larger than 300 liters or water purification filters that rinse large amounts of water, should not be led to the STS, and that it is important that the plant is built according to the size specified in the permit. The statistical analysis carried out in the study also indicates that the age of the plant can be a "natural" cause for very high water levels.

According to the SGU database, the groundwater levels during the time of inspections were much below normal or below normal (SGU 2018). Based on given criteria in the project, about 7% of the STS in the study did not meet the requirements of one meter between the distribution pipe and the groundwater. Due to unreliable control points for groundwater it was uncertain whether the requirements were met or not for 53% STS. Without a reliable control point, it is difficult to follow up the distance between the distribution pipe and the current groundwater level.

It is important to remember that the performed inspections only provide a momentary-view of the STS and not the operation of the STS over time. Following some STS over a longer period would give a better picture of the function over time and a better idea of how sludge and water levels can vary in different parts and with different seasons. There are also no studies on how, for example, different levels of sludge and water in distribution pipes affect the purification process in the STS. This needs to be studied in the future to increase knowledge and provide guidance on what measures can be taken in different types of functional problems.

Place, publisher, year, edition, pages
2019.
Series
RISE Rapport ; 2019:25
Keywords [sv]
markbaserad rening, avlopp, markbädd, infiltration
National Category
Other Natural Sciences Water Treatment
Identifiers
URN: urn:nbn:se:ri:diva-38253ISBN: 978-91-88907-51-6 (electronic)OAI: oai:DiVA.org:ri-38253DiVA, id: diva2:1313020
Funder
Swedish Agency for Marine and Water Management, 985-2017Available from: 2019-05-02 Created: 2019-05-02 Last updated: 2019-05-03Bibliographically approved

Open Access in DiVA

fulltext(2676 kB)17 downloads
File information
File name FULLTEXT01.pdfFile size 2676 kBChecksum SHA-512
9c261cb16a20156cb24f2f05954ae9283ec12bc74c252bfe09b8131c433cbc1b7aabbdfdad1ab64683d1256265485b82706f09a861212a9665eacc82519c5595
Type fulltextMimetype application/pdf

Other links

https://www.havochvatten.se/hav/vagledning--lagar/vagledningar/sma-avlopp/rapporter-och-dokument/rapporter/funktion-hos-markbaserade-reningsanlaggningar-i-falt---komplettering.html
By organisation
Agrifood and Bioscience
Other Natural SciencesWater Treatment

Search outside of DiVA

GoogleGoogle Scholar
Total: 17 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

isbn
urn-nbn

Altmetric score

isbn
urn-nbn
Total: 76 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf