Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Knit On Demand: en studie i utförandet av konceptet masskundanpassade, stickade modekläder
University of Borås, Swedish School of Textiles.
University of Borås, Swedish School of Textiles.
2010 (English)Independent thesis Basic level (degree of Bachelor)Student thesisAlternative title
Knit On Demand : a performance study of the concept mass customized knitted fashion garments (English)
Abstract [sv]

Textilhögskolan i Borås startade projektet Knit On Demand i syftet att undersöka och utvärdera complete garment teknologin. Idén bygger på konceptet masskundanpassning inom området stickning. Huvudaktörerna i Knit On Demand projektet är Textilhögskolan i Borås, återförsäljaren SOM Concept i Stockholm samt Ivanhoe, tillverkare av stickade kläder. Målet med detta arbete är att identifiera och beskriva alla processteg, från den tidpunkt då kunden kliver in i butiken i Stockholm tills det färdiga plagget leverats. Vårt arbete går även ut på att hitta och beskriva förbättringsmöjligheter samt tillhörande kostnads kalkyleringar. För att frambringa relevant data utför och presenterar vi en simulering av hela processen. Metoden som har använts i arbetet bygger på observerade fallstudier från både SOM Concept och Ivanhoe. Den metod vi använder oss av är baserad på kvantitativ data och kvalitativa intervjuer med personer involverade i projektet. Hela processen beskrivs med hjälp av ett nutida och framtida flödesschema. I det nutida flödesschemat är den totala värdehöjande tiden för ett producerat plagg 129 minuter. Förslaget i ett framtida flödesschema visar att processen kan förbättras, bli mer effektiv och påvisar även hur stora förändringarna skulle bli med en snabbare garnleverantör. För att förbättringarna för Knit On Demand ska gå att genomföras måste ordervolymen ökas från 1 plagg till minst 5 plagg per vecka. Förbättringsförslagen är; nya och snabbare garnleverantörer, ny layout plan för Knit On Demand processen hos Ivanhoe, snabbare produktionstid, installation av ett datasystem som hanterar lagerhållning, bättre kommunikation mellan SOM Concept och Ivanhoe samt förbättrad ställtid.

Place, publisher, year, edition, pages
University of Borås/Swedish School of Textiles , 2010.
Series
Kandidatuppsats ; 2010.2.8
Keywords [en]
knit on demand, mass customization, mass customisation, ivanhoe, value stream mapping, lean production
Keywords [sv]
som concept
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:hb:diva-20190Local ID: 2320/6786OAI: oai:DiVA.org:hb-20190DiVA, id: diva2:1312124
Note

Knit On Demand started as a project at the Swedish School of Textiles in Borås with the aim of evaluating complete-garment-technology. It is a mass customization concept within knitting technology. The key players are SOM Concept store in Stockholm and Ivanhoe, a producer of knitted garments in Gällstad.The aim with this thesis is to identify and describe all processes in the concept from the moment when the client enters the store until the Knit On Demand garment is manufactured and delivered to the customer. The purpose is also to find and describe improvement opportunities as well as making an estimated cost calculation for them. To gather relevant data, a simulation of the whole process is performed. The method used is an action research case study of the Knit On Demand project based on quantitative data and qualitative interviews with key persons involved.The process is described with a Value Stream Map of the current state and the future “ideal” state. The current state shows that total value-added lead time for producing one garment is 129 minutes. The future or “ideal” state shows how the processes can be improved and be more efficient, it also shows the importance of improving supplier delivery times.To be able to improve the current Knit On Demand set-up, the order volume must increase from 1 to a minimum of 5 or more orders per week. The improvement suggestions are; new and better suppliers of yarn, new layout and improved down time, plan for the production, improved production time, inventory computer system, better communication between SOM Concept and Ivanhoe.

Program: Textilingenjörsutbildningen

Available from: 2019-04-30 Created: 2019-04-30

Open Access in DiVA

fulltext(4093 kB)60 downloads
File information
File name FULLTEXT01.pdfFile size 4093 kBChecksum SHA-512
f1299e41f72e7e9597f2fd0f6d601615561add29af7ae62cbc2f6c4cf1b262bae5f899744ace47c45ae29475a9e0458bf2ee60959799409d839d99e607a0be98
Type fulltextMimetype application/pdf

By organisation
Swedish School of Textiles
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 60 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 38 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf