Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Planeringsmetodens påverkan på leveransprecision och kapitalbindning: En fallstudie på Gunnebo Industrier AB
Linnaeus University, Faculty of Technology, Department of Mechanical Engineering.
Linnaeus University, Faculty of Technology, Department of Mechanical Engineering.
2019 (Swedish)Independent thesis Basic level (professional degree), 15 credits / 22,5 HE creditsStudent thesisAlternative title
The impact of planning methods on delivery precision and tied up capital : A case study at Gunnebo Industrier AB (English)
Abstract [sv]

Genom att sänka ett företags kapitalbindning och höja dess leveransprecision kan det bli mer konkurrenskraftigt.

Denna studie baseras på ett fallföretag som vill sänka sitt bundna kapital och som har en leveransprecision på 14%.

Syftet med denna studie är att se vilka brister som finns i deras nuvarande arbetssätt för planering samt vad dessa brister leder till med målet att ta fram förslag på hur dessa brister kan motverkas och uppskatta vad effekten blir. Fallföretagets problemområden:

  • Planeringsmetoder och följden av de nuvarande metoderna.
  • Isolationen mellan fallföretagets avdelningar.
  • Bristen på insikt i sin egen kapacitet.
  • En komplex planeringssituation till följd av en produktion med många delprocesser och mycket variation.

Efter analys av insamlad data och deras nuvarande metoder så har förbättringsförslag tagits fram för att fallföretaget ska göra rätt med planeringen från start istället för att ständigt förändra produktionsplanen.

Detta uppskattas leda till en ökning av leveransprecisionen till 70-80% samt en sänkning av kapitalbindningen med 35-40%.

Place, publisher, year, edition, pages
2019. , p. 43
Keywords [sv]
Leveransprecision, Kapitalbindning, Produktionsplanering, Materialstyrning, Huvudplanering, Behovsplanering, Kapacitetsplanering, Detaljplanering
National Category
Production Engineering, Human Work Science and Ergonomics
Identifiers
URN: urn:nbn:se:lnu:diva-80804OAI: oai:DiVA.org:lnu-80804DiVA, id: diva2:1291510
External cooperation
Gunnebo Industrier AB
Subject / course
Industrial Organisation and Economics
Educational program
Industrial Engineering and Management, 180 credits
Supervisors
Examiners
Available from: 2019-03-21 Created: 2019-02-25 Last updated: 2019-03-21Bibliographically approved

Open Access in DiVA

fulltext(2593 kB)23 downloads
File information
File name FULLTEXT01.pdfFile size 2593 kBChecksum SHA-512
48bce0dc5d6118f8a1e44c93501ce2e2d0b17ca2036a8f4f0b1610f99b3d90bbef7f04fcba08dc9b90a8a2e6495decc7016077d30df35a2c926ccc1dae8f39e8
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Bengtsson, ChristofferNilsson, Aron
By organisation
Department of Mechanical Engineering
Production Engineering, Human Work Science and Ergonomics

Search outside of DiVA

GoogleGoogle Scholar
Total: 23 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 85 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf