Digitala Vetenskapliga Arkivet

Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Betongdigitalisering: Produktionsplanering av betong med hjälp av 4D-simulering
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering.
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering.
2019 (Swedish)Independent thesis Advanced level (professional degree), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

A well-implemented production planning improves and facilitates the production of site-built constructions. The construction industry has in recent years had a reduced productivity, despite the fact that several new programs have been developed that can improve the production planning process.

The report investigate whether 4D-modeling can be used as a planning tool to accelerate and optimize the operation of site-built concrete frameworks, as well as to determine if the casting system is optimal and / or improved. To investigate this, four research questions have been answered. These questions are: Can 4D-modeling be used to improve the planning of concrete-built frameworks, Can 4D-modeling be used to optimize workplace activities, How to measure the concrete's strength before formwork is removed and How can 4D-simulation support production follow-up?

In order to achieve the purpose and answer the research questions, literature in the field has been gathered together with data collection from a case study obtained from study visits at the construction site.

The result shows that the estimated strength obtained from the temperature sensors in Vema Distant are relatively equal to the calculated strength from the planning production software PPB. Using 4D to visualize the concrete curing process the site manager can easily plan and follow-up when the formwork for the concrete walls and the shoring of the concrete slabs can be removed.

The conclusion is that 4D-simulation will lead to a better overview of the project where a company can optimize production activities such as reinforcement, formwork, concrete casting and removl of formwork. This can lead to a shortened construction time, however, the curing time of the concrete must be taken into consideration to shorten the construction time further. 4D-simulation at the planning stage, together with steam-hardened concrete and heat exchanger / heat fans, can shorten the construction time considerably during the winter. Higher strength classes may also be an option to speed up the curing rate.

As the model remains after a project, it is easy to go back and investigate how the final time schedule is in line with the planned time schedule. If the difference is large, a company can detect bottlenecks and find solutions for the next project.

Place, publisher, year, edition, pages
2019. , p. 75
Keywords [sv]
Digitalisering, hållfasthet, avformning, folkboende
National Category
Construction Management
Identifiers
URN: urn:nbn:se:ltu:diva-72032OAI: oai:DiVA.org:ltu-72032DiVA, id: diva2:1270512
Subject / course
Student thesis, at least 30 credits
Educational program
Civil Engineering, master's level
Supervisors
Examiners
Available from: 2019-08-12 Created: 2018-12-13 Last updated: 2023-09-06Bibliographically approved

Open Access in DiVA

fulltext(4160 kB)826 downloads
File information
File name FULLTEXT02.pdfFile size 4160 kBChecksum SHA-512
20fbe687f90b8d187cfb48394e4c0bef243e51b7bd59474e4b0448aaf4717ce4c12eaaabd42278a07d22a2529ecec13b1904765bd7466ea089adc0c18a6321d5
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Jelleryd, HampusJelleryd, Felix
By organisation
Department of Civil, Environmental and Natural Resources Engineering
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 826 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 304 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf