Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
En kartläggning av inköpsprocessen för fabriksutrustningen till en Husmutternfabrik
Mälardalen University, School of Innovation, Design and Engineering. (maskinteknik)
2018 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

The purpose of the project: The aim of this project was to finish the current BOM-list that already existed so it could be sent to X-ponent. When that was done it got possible to identify the non X-ponent products from other suppliers. These products had to be order by the needs to build walls, roof, and etc. When all the products were on place on the BOM-list the next goal was to send it back to X-ponent so they could buy them and then start to build different car-riages/boards by knowing who to call. The last step was to plan a delivery based on the most effective way by identify the risks. Make sure that the existing BOM-list is finished with the most suitable tools/ equip-ment’s and how to strategically buy them from X-ponent. How can X-ponent buy the non X-ponent products effective from the suppliers? How will these assembled products arrive effective from X-ponent to Husmutterns facil-ity?  How will these products be financed?Sum: A plan for the purchaser on Husmuttern AB so he/she just have to call X-ponent only once and to tell them a thought date for the products to be on place.Method: To achieve with these tasks, the author had to do a literature study on lean and six sigma tools. The comparison that was done between Husmuttern AB and XX gave a clear im-age about how respective companies purchasing process are. When these studies were done it became easier to handle these tasks, sush as fill in the rest on the BOM-list, knowing how transport the goods effective and also know what to take up on the attended meetings with the suppliers and to communicate through email and phone.Study results: The result for this project was to fill the required equipment’s/tools for the company that is thought to be purchased, considering the best products for these types of car-riage/boards. When all the tools/equipment’s were covered and finished the result was how to strategically buy them from this supplier (X-ponent). The author had to find the best logistics company to deliver these products and therefore was the delivery time estimated and founded based on Google maps estimated time to travel from Phils to X-ponent and then to Husmuttern AB:s facility. To transport the goods from X-ponents facility to the truck was estimated based on earlier experience out of the seller on X-ponent and CEO on husmuttern. The total price for each product from X-ponent:The exact price exkl moms:1 Instruction carriage/board: XXkr2 Tool/equipment carriages/boards: XXkr1 Charging carriage/boards: XXkr1 Unloading carriage: XXkr1 Unrolling stand: XXkr16 Pallet carriages: XXkrThe estimated price for the fixtures:1 Roof fixture: XXkr1 Wall fixture: XXkr1 Inner wall/inner roof fixture: XXkr1 Floor fixture: XXkr1 Corner fixture: XXkrThe estimated delivery price for the total transport: XXkrA total estimated price for the whole process: XXkr excl VATRecommendations: When the facility is on place and is producing the houses, it is important that the staff on the company evaluate the products that was bought, so if they know if any changes will be done or not. This will also help them to save money so they do not have to buy same tools/equipment over and over again. If you see it from another perspective, it will make4 (67)it possible for Husmuttern to tell X-ponent that the products they bought is not good as they thought and that will help X-ponent to fix the coming problems, and maybe make a discount to other Husmuttern facilities that probably be established in the coming future.It is also very im-portant that the company always looks what the market has to tell, and be very aware what the costumers needs in the coming future.

Place, publisher, year, edition, pages
2018. , p. 67
Series
Studies in Sustainable Technology / Projektrapport
Keywords [en]
CAD, MUDA, MURI, MURA, JIT, FAT, SAT, TPS, RSC, 5S
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:mdh:diva-40248OAI: oai:DiVA.org:mdh-40248DiVA, id: diva2:1233418
External cooperation
Husmuttern AB
Subject / course
Mechanical Engineering
Presentation
2018-05-30, Filharmonin, Eskilstuna, 20:01 (Swedish)
Supervisors
Examiners
Available from: 2018-07-30 Created: 2018-07-17 Last updated: 2018-07-30Bibliographically approved

Open Access in DiVA

fulltext(3038 kB)5 downloads
File information
File name FULLTEXT01.pdfFile size 3038 kBChecksum SHA-512
0ba7bd1d66219fb1d6bfcce2b2600c1a6cbcdcd7071e46769389789e68f19e45047646d4e9adb35aff1587c5ce1c0c7ed712e0d67fd7c3a6bfe9c6fc859c9b8f
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Sabbagh, Fidel
By organisation
School of Innovation, Design and Engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 5 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 22 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf