Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Kalkylanalys av stambyten: En jämförelse av stambytesprojekt för att belysa viktiga parametrar vid initial kalkylering
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
2018 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Calculation analysis of pipe replacement projects : A comparison of pipe replacment projects to illustrate important parameters of initial calculation (English)
Abstract [en]

Sweden’s real estate portfolio has a major renovation requirement. A large part of the renovations that need to be carried out are pipe replacement projects. These are major projects and not all housing associations are aware of the extent financial consequences it brings. Therefore, planning in the economy throughout the project are important. This thesis aims at seeing what affects a production estimate to differ from the actual final cost.ÅF infrastructure division thought that their calculations of the estimated cost for production too often differs to the actual final cost. At a first meeting with ÅF, it appeared that there has been discussion and thought for solutions to the problem for some time. The thesis is based on 3 issues that will provide answers on how to make a better production estimate.In order to answer the questions, project managers have been interviewed and literature has been studied. The assigned reference objects have been analyzed and compared in tables. This thesis has resulted in the insight of that the project managers at ÅF are relatively good at estimating the original cost of what the contractor produces for the pipe replacement projects. After the analysis, recommendations have been presented that can be developed and implemented in the ÅF approach to calculate their estimated cost of production even better. By calculating the costs that are not included in the original cost for the contractors in a more methodical manner, based on experience, the production cost can be optimized.The work has been going on for a limited time with delimitations and a selection of projects. The results presented in the report should be applied with caution and awareness about the differences in the projects.

Place, publisher, year, edition, pages
2018.
Series
TRITA-ABE-MBT ; 1881
Keywords [en]
Cost control, Pipe replacement projects, Renovation about enhancement projects, Calculation analysis, Project management, Building economy, Cost of production, Production, Developer costs
Keywords [sv]
Kostnadsstyrning, Stambyte, ROT-projekt, Kalkylanalys, Projektledning, Byggekonomi, Produktionskostnad, Produktion, Byggherrekostnader
National Category
Construction Management
Identifiers
URN: urn:nbn:se:kth:diva-232169OAI: oai:DiVA.org:kth-232169DiVA, id: diva2:1232829
External cooperation
ÅF Infrastructure
Educational program
Bachelor of Science in Engineering - Constructional Engineering and Design
Supervisors
Examiners
Available from: 2018-07-13 Created: 2018-07-12 Last updated: 2018-07-13Bibliographically approved

Open Access in DiVA

Kalkylanalys av stambyten(1987 kB)14 downloads
File information
File name FULLTEXT01.pdfFile size 1987 kBChecksum SHA-512
b9888a2e67360d2471aa1807269720ea4f767c213dace8b31130e5a075bf153b145b1117e9f4abf028d7113359e5f74a96e064ff29b23e2b8b9b38b89182e194
Type fulltextMimetype application/pdf

By organisation
Building Technology and Design
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 14 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 22 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf