BIM i produktionsplanering: Förutsättningar och ledarskap
KTH, School of Architecture and the Built Environment (ABE), Real Estate and Construction Management.
KTH, School of Architecture and the Built Environment (ABE), Real Estate and Construction Management.
2018 (Swedish)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesisAlternative title
BIM in production planning : Prerequisites and leadership (English)
Abstract [sv]

Som en följd av att byggbranschen implementerar och använder sig av BIM har nya yrkesroller skapats för att hantera och leda arbetet. Forskning har visat att det råder en osäkerhet gällande dessa yrkesroller, vilka arbetsuppgifter och vilka faser de ska vara delaktig i. BIM används generellt sett i större utsträckning i projekteringsfasen än produktionsfasen, samtidigt visar forskning att det finns fördelar om BIM används genom alla faser. Denna studie har undersökt hur det i planeringen inför produktion skulle kunna gå att använda sig av BIM, vilka förutsättningar som finns och vilken roll som ska leda arbetet. Baserat på en intervjustudie presenteras fyra arbetsgångar gällande några av produktionsplaneringens områden: Arbetsmiljö, APD-plan, Tidsplan, Kalkyl och hur dessa skulle kunna genomföras med stöd av BIM. I en enkätstudie har sedan platschefer, arbetsledare och kalkylatorer fått svara på frågor angående inställning, förutsättningar och ledarskap kopplat till arbetsgångarna. Fallstudien visar att det finns goda förutsättningar att använda BIM i produktionsplanering då de anställda ser en stor nytta och är positiva till att arbeta med stöd av BIM. Samtidigt konstateras att kunskapsnivå är blandad och skiljer mellan områdena vilket kan skapa ett hinder i implementeringen. För att arbeta med stöd av BIM anses den nya rollen, i studien kallad BIM-ledare, som viktig. I arbetet med kalkyl, där de anställda visar en högre erfarenhet och kunskap om BIM än övriga områden, anses BIM-ledaren framförallt behövas som tekniskt stöd. I övriga områden anses BIM-ledaren istället ha en mer närvarande roll och vara delaktig i framtagandet. BIM-ledaren anses behöva ha stor erfarenhet av byggprocessen. På vilken yrkesroll ansvaret för modellen skall ligga på i produktionsplanering finns en osäkerhet där BIM-ledare, platschef och projekteringsledare är tänkbara kandidater.

Baserat på personalens bedömda engagemang och kompetens har studien utifrån teorin om situationsanpassat ledarskap presenterat olika ledarstilar som kan ses som vägledning för BIM-ledaren. För arbetet med kalkyl rekommenderas en delegerande ledarstil, för arbetet med arbetsmiljö och APD-planeringen en coachande och stödjande ledarstil medan arbetet med tidplan en mer instruerande ledarstil.

Abstract [en]

As a result of the AEC industry implementing and using BIM, new roles have been created to manage and lead the work. Research has shown that there are uncertainties regarding these roles, which tasks they should perform and which phases they will be involved in. BIM is generally used more during the design phase than the production phase, even though research shows that there are advantages if BIM is used throughout all phases. This study has investigated how the planning for production could make use of BIM, the conditions for implementation and the role that will manage the work. Based on an interview study, four areas of production planning: safety planning, site planning, time scheduling and calculation are examined. A scenario for each area and how these could be implemented with BIM is presented followed by a survey of the employees working on the matters and their thoughts and their attitude towards it. The case study shows that there are good conditions for using BIM in production planning as employees see great benefits and are positive about working with BIM. At the same time, it is noted that knowledge levels differentiate between the employees and between the areas, which can create an obstacle to the implementation. The BIM manager is considered important in all four areas. In the work with calculations, where employees show a higher experience and knowledge level of BIM than other areas, the role is considered to be needed as mostly technical support. In other areas, BIM managers are considered to take more part of the work process. They show that the BIM manager is considered to have extensive experience in construction. There is an uncertainty about the responsibility for the model in production planning where the BIM manager, site manager and design manager are all considered for the task.

Based on the employees estimated commitment and competence, the study has presented different leadership styles with respect to the theory of situational leadership. This could be seen as guidance for the BIM manager. For the work with calculations, a delegating leadership style is recommended, for safety and site planning a coaching and supporting leadership style is recommended. For the work with time scheduling a more directing leadership style is recommended.

Place, publisher, year, edition, pages
2018. , p. 68
Series
TRITA-ABE-MBT ; 18121
Keywords [en]
BIM, production planning, safety planning, site planning, construction logistics plan, time plan, calculation, leadership, management
Keywords [sv]
BIM, produktionsplanering, Arbetsmiljö, APD-plan, Kalkyl, Tidsplan, ledarskap
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:kth:diva-231765OAI: oai:DiVA.org:kth-231765DiVA, id: diva2:1229880
External cooperation
JM AB
Supervisors
Examiners
Available from: 2018-07-02 Created: 2018-07-02 Last updated: 2018-07-02Bibliographically approved

Open Access in DiVA

fulltext(3525 kB)42 downloads
File information
File name FULLTEXT01.pdfFile size 3525 kBChecksum SHA-512
c2e269fcf9c14e55e8c05e057c5c6ee478640ba2fb7fcf3a1761f097918e9140a63931eeda134c3cedfa786f39b51bdd8a40adae13bcb08e7ab91991750d83a1
Type fulltextMimetype application/pdf

By organisation
Real Estate and Construction Management
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 42 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 74 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf