Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Utsättning - från ritning till verklig placering: En kartläggning av fel i produktionsskedet till följd av felaktig utsättning
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Industrial Engineering & Management.
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Industrial Engineering & Management.
2018 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

Layout is a professional term which means to determine the position of construction elements. Layout is done throughout the construction process, it is the stage linking the blueprints to the real placement of the elements such as walls. There are many factors that can cause a less precise measuring, such asbad accuracy, lack of experience, bad weather conditions, or instruments that are not properly maintained. This will affect the construction project both in terms of time and economy.

Because of a failing layout, consequences follow for work teams who depend on this being correctly done. Using JM AB as an example, the purpose of this thesis is to investigate the reasons which leads to inaccuracy in the layout process. In order to accomplish a result interviews and a survey has been done. In addition, two on- site visits have been made and research in the company’s economic follow-up for the projects.

A possible solution for companies is to come up with a new role which combines two earlier titles into one. If they were to combine the work of a measuring engineer with a supervisor, the role would be more attractive and possible to grow within. Today there’s a lot of personnel who moves on to new challenges and we think that the new role could be a solution to this this problem.

Weather conditions is also a problem. Rain, ice formation and strong sun are examples of conditions that creates difficulty for the layout. More research is required in this area.

Place, publisher, year, edition, pages
2018. , p. 48
Keywords [sv]
utsättning, mätteknik, fel, byggbranschen, mättekniker
National Category
Construction Management
Identifiers
URN: urn:nbn:se:uu:diva-355548ISRN: UTH-INGUTB-EX-B-2018/01-SEOAI: oai:DiVA.org:uu-355548DiVA, id: diva2:1229603
External cooperation
JM AB
Educational program
Bachelor Programme in Construction Engineering
Presentation
2018-05-31, 09:00 (Swedish)
Supervisors
Examiners
Available from: 2018-07-02 Created: 2018-07-01 Last updated: 2018-07-02Bibliographically approved

Open Access in DiVA

fulltext(2860 kB)6 downloads
File information
File name FULLTEXT01.pdfFile size 2860 kBChecksum SHA-512
ed98702f5fc1f8e5d7d521c943a071e85fb8afc611734e9bdbf8f6872e49d4e945e58799fbc3b3a00481f221d006bfcb45ba3d9a829ee4f82da188347e30af24
Type fulltextMimetype application/pdf

By organisation
Industrial Engineering & Management
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 6 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 46 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf