Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Brister i arbetsmiljöprojektering: En studie i vilka brister som finns i arbetsmiljöprojektering
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Industrial Engineering & Management.
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Industrial Engineering & Management.
2018 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Flaws in work enviroment projection (English)
Abstract [en]

This work aim to contribute to making constructions sites in Sweden safer. The purpose is achieved by focusing on the preventing work that is made during the planning phase. Therefore this work will result in recommendations on how  to better prevent work environment hazards and which risks are the hardest to identify. During the planning phase a work environment document is required to be established. These documents and the belonging risk analysis is the core of this work. The problem is identified thru qualitative interviews with four informants. All of the four informants shared the opinion about knowledge being inadequate in the planning stage. This is revealed in the work environment plan that often is copied from another project instead of being adapted for every unique project.

To achieve a proper work environment plan a wide range of knowledge is required. This makes it hard for one person to carry out this work while also leading the projection since vast experience in work environment is needed. The result makes the foundation for the presented solutions. The solutions are that the project leader and BAS-P should be two different persons and that the handover from BAS-P to BAS-U should be carried out thru a physical meeting between the two of them. By dividing the projection leader and BAS-P in to two different people it allows BAS-P to solemnly focus on the work environment issues while the projection leader can focus on propelling the project forward.

Place, publisher, year, edition, pages
2018. , p. 43
Keywords [sv]
Arbetsmiljöprojektering, Arbetsmiljö, Arbetsmiljöplan, BAS-P.
National Category
Other Civil Engineering
Identifiers
URN: urn:nbn:se:uu:diva-355540ISRN: UTH-INGUTB-EX-B-2018/06-SEOAI: oai:DiVA.org:uu-355540DiVA, id: diva2:1229573
External cooperation
Tengbomgruppen AB
Educational program
Bachelor Programme in Construction Engineering
Supervisors
Examiners
Available from: 2018-07-02 Created: 2018-07-01 Last updated: 2018-07-02Bibliographically approved

Open Access in DiVA

fulltext01(1009 kB)22 downloads
File information
File name FULLTEXT01.pdfFile size 1009 kBChecksum SHA-512
64beaada3a81937c8380f3056547780dded6cc9efb9c010b2680c32b49729e5c25f2512c22bd53f281b97dc999aff31ae6bcf12f6ffc31a90d697321d566ecbf
Type fulltextMimetype application/pdf

By organisation
Industrial Engineering & Management
Other Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 22 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 139 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf