Claim management in EPC-Projects: A case study of claim causes and claim management during plant installation
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences.
2018 (English)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

When several parties are involved in a construction project are conflicts inevitable, and when one party feel that another party are not following their work according to the agreed contract, can they issue a claim. Claim management and causes of claims has been addressed by previous research, but there is lack of attention to study claim management specifically in EPC-projects.

The purpose of this thesis is to shed some light on claim management and identify cause of change claims, specifically in the context of EPC-projects. A case study was conducted within an organisation that executes complex plant EPC-projects, where several parties are involved. This thesis has applied tools of root cause analysis in order to identify the causes of change claims, and conducted focus groups and semi-structured interviews to better understand problems associated with claim management and how the relationship between two parties affects claims.

The thesis concludes that the most common root causes to sub-contractor change claims are related to design where not enough information for design input has been provided, or related to installation where sub-contractors issue change claims in order to fix conflicts caused by themselves. Other major root causes are related to insufficient instructions provided by the principal organisation or requests of changes by one party. The thesis also concludes that claims during plant installation are avoided since more time is required for settling an official claim. Poor documentation is a major reason why the settlement of official claims requires more time. Further does this thesis conclude that the relationship between two parties does not affect claims, and in contrast might the relationship benefit from claims if causes are treated properly.

Place, publisher, year, edition, pages
2018. , p. 88
Series
TVE-MILI ; 18007
National Category
Other Engineering and Technologies not elsewhere specified
Identifiers
URN: urn:nbn:se:uu:diva-355309OAI: oai:DiVA.org:uu-355309DiVA, id: diva2:1228458
Educational program
Master Programme in Industrial Management and Innovation
Supervisors
Examiners
Available from: 2018-06-28 Created: 2018-06-28 Last updated: 2018-11-01Bibliographically approved

Open Access in DiVA

fulltext(2126 kB)143 downloads
File information
File name FULLTEXT01.pdfFile size 2126 kBChecksum SHA-512
62362fac46afe04bf4dbddc6eeecef949d18766fff0799a41bff06856cf9450a57b9a95ac39c897a6fb63401031e15a05ac094fbba13cf326ae317f60c2263bb
Type fulltextMimetype application/pdf

By organisation
Department of Engineering Sciences
Other Engineering and Technologies not elsewhere specified

Search outside of DiVA

GoogleGoogle Scholar
Total: 143 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 85 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf