Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Effektivisera implementering av BIM i produktionen: En studie om vad som krävs för att underlätta implementering av digitala verktyg i produktionen
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
2018 (Swedish)Independent thesis Basic level (university diploma), 5 credits / 7,5 HE creditsStudent thesisAlternative title
How to implement BIM to theproduction (English)
Abstract [en]

The general mode of operation within the building and construction sector in the present days are classified as outdated with plenty of room for improvement. Fortunately, this has been picked up by more organizations and has enabled them to spot the future of the work procedures in digitalisation. This has now been put on the agenda of implementation within the organisations as it has proven to be more efficient not to mention profitable.

BIM (Building Information Modeling) is today frequently used within projection but the main question remains, the question on “how to implement BIM to the production”. The evolutionary curve within projection is exponentially increasing and at the same time, the vision of a more digital driven production process within the building sector is becoming more of a reality.

This report is mainly based on field studies in which the building sector often touches the underlying factors on the implementation of digital tools. The focus area lies within the production stage of which many studies show that there is in fact an existence of good knowledge of digitalisation and resources within the branch to apply it to the steamline in order to achieve increased efficiency. However, the process of advancement is being pulled back by the human factor in terms of the individual ́s limited knowledge of digitalisation, the willingness and fear of change and also the generation gap.

The Final result is based on fact collection, surveys, construction exhibitions and interviews with experienced workers in the targeted field. Study visit has been arranged to SWECO Civil AB and other companies with the similar qualifications. The advantages of implementing digital tools to the day- to-day work are considered to be many. Performing work tasks using for example an ipad will result in a simplified workday in the terms that one will be able to navigate and store required data much more efficiently than before. The process will become less time consuming and with the focus now directed to what is more important, it will result in an improvement of the overall quality. In the long term the aboves mentioned measure is equivalent to a more competitive and profitable organisation.

Place, publisher, year, edition, pages
2018. , p. 53
Series
TRITA-ABE-MBT ; 1826
Keywords [sv]
BIM, Effektivisering, Byggproduktion, Implementering, Digitalisering
National Category
Construction Management
Identifiers
URN: urn:nbn:se:kth:diva-231114OAI: oai:DiVA.org:kth-231114DiVA, id: diva2:1222634
External cooperation
Sweco Civil AB
Subject / course
Building Technology
Educational program
Higher Education Diploma - Construction Management
Supervisors
Examiners
Available from: 2018-07-03 Created: 2018-06-21 Last updated: 2018-07-03Bibliographically approved

Open Access in DiVA

fulltext(519 kB)7 downloads
File information
File name FULLTEXT01.pdfFile size 519 kBChecksum SHA-512
4c06e28f2ba46bcad2b4e7ba21f6c1d68881c629c68abd3cf36d0873278e6e628660d24fbfae951ff6b8e4e2951c884aed7782b577539ea15efcd850cd400774
Type fulltextMimetype application/pdf

By organisation
Building Technology and Design
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 7 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 27 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf