Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Brandskyddsprojektering kopplad till BIM
Örebro University, School of Science and Technology.
Örebro University, School of Science and Technology.
2018 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Fire Protection Design Linked to BIM (English)
Abstract [sv]

Brandskyddsprojekteringen i olika projekt sker i dagsläget i 2D-CAD där filerna sparas iPDF-format. Detta framgick från de olika intervjuerna som skedde i samband med rapporten.Detta sätt att projektera på kan göra så att det uppstår olika typer av problem i projektet bådeför brandskyddsprojekteringen och de övriga discipliner som är med och projekterar. Närbrandskyddsprojekteringen inte deltar i att använda 3D-BIM i de olika projekten så försvårassamordningen av modellerna som görs av arkitekten eller BIM-samordnaren. De problem somkan uppstå består även av de möjligheter som inte tas till vara på vid BIM-användning avbrandskyddsprojekteringen. Dessa möjligheter och fördelar kan t.ex. vara ökad förståelse förkoncept och färdig byggnad, minskad tidsåtgång i byggskedet, högre produktivitet ochkvalitet m.fl. [1]. Det finns även möjligheter inriktad till brandskyddsprojekteringen där BIMbland annat underlättar framtagningen av brandskyddsritningar ochlivssäkerhetsystemsritningar.Implementering av BIM i brandskyddsprojekteringen kan ske på olika sätt. Efter delitteraturstudier som gjorts har det kommit fram till att BIM kan implementeras på olika sättgenom att t.ex. ta till vara på de olika förutsättningar som finns i dagsläget. Dessaförutsättningar är olika BIM-programvaror och BIM-kurser som gör det lättare attimplementera BIM för brandskyddsprojekteringen. Det går även att vid upphandling av deolika entreprenadformerna ge förslag och ställa krav på att projekteringen ska ske i BIM iförfrågningsunderlag eller i CAD- och BIM-manualen. Krav och regler kan även ställas avregeringen där ett liknande exempel är i Storbritannien där regeringen krävt byggnads- ochinfrastrukturprojekt att jobba med BIM i nivå 2 sedan April 2016 [2, 3].Boverkets byggregler kan också ställa mer strikta krav när det gäller projekteringen utifrånPBL och PBF där de kan ställa krav på att det ska ske i BIM.Utifrån dessa problem, möjligheter och förutsättningar som finns idag med implementering avBIM i brandskyddsprojekteringen kommer övergången inte att vara lätt och kommer inte attske snarast. Men detta borde göras i och med att BIM utvecklas hela tiden och då kommerövergången från 2D-CAD att bli ännu svårare i framtiden. Därmed bordebrandskyddsprojekteringen och de övriga disciplinerna i byggprocessen sträva att jobba i 3DBIMeftersom att detta nyttjar för alla som är delaktiga i projektet.

Abstract [en]

Fire protection design in various projects is currently done in 2D-CAD where the files aresaved in PDF format. This was evident from the various interviews that took place inconnection with the report. This way of designing can cause various types of problems in theproject that occur for both the fire protection design and the others disciplines involved in thedesigning. When the fire protection design does not participate in using 3D-BIM in theprojects, collaboration of the models made by the architect or the BIM coordinator willcomplicate. The problems that may arise also consist of the possibilities not taken for BIMuse of the fire protection design. These opportunities and benefits can for example be a betterunderstanding of concepts and completed building, reduced time spent in the constructionphase, higher productivity and quality etc. [1]. There are also possibilities for the fireprotection design, where BIM facilitates the production of the fire protection plans and lifesecuritysystem drawings.Implementation of BIM in the fire protection design can be done in different ways. Followingthe literature studies, it has come to conclusion that BIM can be implemented in differentways for example by taking advantage of the various conditions that exist today. Theseconditions include different BIM software and BIM courses that makes it easier to implementBIM for the fire protection design. It is also possible to make proposals for the design of BIMin the specifications or in the CAD- and BIM manuals when procuring the various types ofcontractors. Requirements and rules can also be set by the government where a similarexample where made in the UK where the government demanded construction andinfrastructure projects to work with BIM at level 2 since April 2016 [2, 3].Boverkets byggregler can also make stricter requirements regarding the design by PBL andPBF, where they can demand that it should be done in BIM. Based on these problems,opportunities and conditions that exist today with the implementation of BIM in the fireprotection design, the transition will not be easy and will not be happening soon. But thisshould be done as BIM evolves all the time and then the transition from 2D CAD will be evenmore difficult in the future. Therefore, the fire protection design and the other disciplines inthe construction process should aim to work in 3D-BIM, as this is useful to all those who areinvolved in the project.

Place, publisher, year, edition, pages
2018. , p. 40
Keywords [en]
Fire protection design, 2D-CAD, BIM, collaboration.
Keywords [sv]
Brandskyddsprojektering, 2D-CAD, BIM, samordning.
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:oru:diva-67303OAI: oai:DiVA.org:oru-67303DiVA, id: diva2:1220765
Subject / course
Construction Engineering
Supervisors
Examiners
Available from: 2018-06-19 Created: 2018-06-19 Last updated: 2018-06-19Bibliographically approved

Open Access in DiVA

fulltext(881 kB)6 downloads
File information
File name FULLTEXT01.pdfFile size 881 kBChecksum SHA-512
f4350745532ad10f6a727a1ed752e64180ce315cc0855630614cca82f36216609be74ac4d3d4629f170880c1c46b106eb7080b13fc40c2c0f693f6f1426be8fd
Type fulltextMimetype application/pdf

By organisation
School of Science and Technology
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 6 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 14 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf