Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Utveckling av framtidens produktionsflöde med fokus på intern logistik och produktionslayout: En studie på Permobil Produktion AB
Luleå University of Technology, Department of Engineering Sciences and Mathematics.
Luleå University of Technology, Department of Engineering Sciences and Mathematics.
2018 (Swedish)Independent thesis Advanced level (professional degree), 20 credits / 30 HE creditsStudent thesis
Abstract [sv]

Permobil Produktion AB är världsledande tillverkare av elektriska rullstolar. Produktionsanläggningen i Timrå har verksamhet i två byggnader: en produktionslokal där stolarna monteras, anpassas och levereras till kund och ett produktionslager som förser monteringen med material. Dessa två byggnader ligger 600 meter separerade, vilket innebär slöseri i materialförsörjningen. Påfyllnadstiden av material från produktionslagret till produktionslinan är avtalad till fyra timmar.

Syftet med arbetet är att minska ledtiden för påfyllning av material för att skapa ett jämnare produktionsflöde. Genom detta kan sekvensen som stolar tillverkas i låsas senare, vilket innebär att sekvensen kan optimeras. På grund av problem med saldodifferenser påbörjas stolar i produktionslinan som inte kan slutföras när materialbrist uppstår. Med en kortare ledtid för påfyllning av material kan man i större utsträckning undvika att plocka ur stolen från produktionslinan, vilket är en bidragande faktor till ryckigt flöde.

I arbetet har en nulägesstudie genomförts för att skapa en förståelse för problemet. Därefter besöktes tre olika motormonteringar; Scania, Volvo Cars Engine och Volvo Group Trucks Operations för att skapa inblick i möjliga lösningar. Till sist utvecklades olika lösningar för lager- och produktionslokal.

Arbetet har resulterat i tre lösningsförslag, varav ett är kortsiktigt och två långsiktiga. Samtliga innehåller ett materialtorg med plockyta placerad i produktionslokalen. De långsiktiga förslagen innefattar även smalgångslager med olika automationsgrad. Längsta ledtiden för materialpåfyllning är uppskattad till 56 minuter i samtliga lösningar. Lösningsförslagen presenteras för Permobil Produktion AB med återbetalningstider och rekommendationer på vidare arbete för att säkerställa utrymmeskrav med mer omfattande data.

Abstract [en]

Permobil Produktion AB is a world leading manufacturer of electric wheelchairs. The production site in Timrå consists of two main buildings: the production factory where chairs are assembled, customised and delivered to customer and the production warehouse that provides the production line with material. These two buildings are situated 600 meters apart which results in wastes in the material supply chain. The lead time of material refill, from warehouse to production line, is contracted to four hours.

The purpose of this thesis is to reduce the lead time for material refill to create a more even production flow. Hereby, the sequence to manufacture chairs can be frozen later giving opportunity to optimise the sequence better. Due to problem with balance differences chairs are initiated at the production line without being possible to complete due to material shortage. With a shorter lead time for material refill more chairs will be possible to complete without being taken off the line which is a contributing factor to an uneven production flow.

Included in the thesis work are an analysis of the current situation and visits to three engine assemblies, Scania, Volvo Cars Engine and Volvo Group Trucks Operations. This was to collect useful information about the problem and ways to solve it. Finally, solutions where developed for the warehouse and for the production.

The thesis has resulted in three solutions, one-short term and two long-term solutions. All consisting of a supermarket for manual material picking placed next to the production line. The long-term solutions also include a narrow aisle warehouse with differing levels of automation. The longest lead time for material refill is estimated to 56 minutes for all solutions. The solutions are presented to Permobil Produktion AB accompanied with payback times and recommendations of further work to ensure restriction of areas with more comprehensive data.

Place, publisher, year, edition, pages
2018.
Keywords [en]
Material supply, warehousing, supermarket, narrow aisle warehouse
Keywords [sv]
Materialförsörjning, lagerhållning, materialtorg, smalgångslager
National Category
Mechanical Engineering Production Engineering, Human Work Science and Ergonomics
Identifiers
URN: urn:nbn:se:ltu:diva-69403OAI: oai:DiVA.org:ltu-69403DiVA, id: diva2:1217070
External cooperation
Permobil Produktion AB
Subject / course
Student thesis, at least 30 credits
Educational program
Mechanical Engineering, master's level
Supervisors
Examiners
Available from: 2018-06-19 Created: 2018-06-12 Last updated: 2018-06-19Bibliographically approved

Open Access in DiVA

fulltext(2766 kB)58 downloads
File information
File name FULLTEXT02.pdfFile size 2766 kBChecksum SHA-512
508fdd4d55703fa53bf6f9411c1a78ac7f6869e5a8ddd3d7a3ee95c0251da29e1f34a74ddd8b7c19934dc7b1099d058aae1f3b866573d7a097871239ebc784d8
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Holmgren, ErikaLinse, Lydia
By organisation
Department of Engineering Sciences and Mathematics
Mechanical EngineeringProduction Engineering, Human Work Science and Ergonomics

Search outside of DiVA

GoogleGoogle Scholar
Total: 58 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 89 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf